Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 129     Entry time: Friday, March 18, 2022, 12:12
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Repair 
Subject: q15 repair 

 beamlines replaced leaking insulator on q15, circuit #4. See updated pdf for replacement part and location.

Attachment 1: tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdf  646 kB  | Show | Hide all
Attachment 2: InkedRH1_0044_LI.jpg  6.955 MB  | Show | Hide all
Attachment 3: RH1_0046.jpg  3.038 MB  | Hide | Hide all
RH1_0046.jpg
Attachment 4: RH1_0050.jpg  3.187 MB  | Show | Hide all
Attachment 5: RH1_0049.jpg  3.104 MB  | Show | Hide all
ELOG V2.9.2-2455