Message ID: 125     Entry time: Friday, March 06, 2020, 13:36
Author: Keith C Ng 
Category: M9 
Type: Repair 
Subject: M9 B1 moved to warm cell 

 The M9 B1 was removed from the M9 channel surveyed and moved to the remote handling warm cell for refurbishment.

The warm cell is currently locked. Remote Handling should be contacted if access is needed to B1.

A field map of B1 is attached as a pdf file.

Attachment 1: 2020_M9_B1_field_survey_out_of_channel.pdf  137 kB  | Show | Show all