Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 124     Entry time: Monday, February 24, 2020, 15:13
Author: Keith C Ng 
Category: M9 
Type: Repair 
Subject: m9 q1q2 repair laser tracker shoot 

Beamlines shot the position of the M9 T2 port and B1 flange for setting the M9 test stand flanges today. We removed the target jigs after this was done.

Attachment 1: 20200224_m9project_P1040686.JPG  5.466 MB  | Show | Hide all
Attachment 2: 20200224_m9project_P1040688.JPG  5.469 MB  | Hide | Hide all
20200224_m9project_P1040688.JPG
ELOG V2.9.2-2455