Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 11     Entry time: Tuesday, October 16, 2012, 19:47
Author: Grant Minor 
Category: M9 
Type: Repair 
Subject: Inspection of failed double-indium thru-ring TB22148 

See inspection notes attached for failed M9T2 double-indium thru-ring TB22148, inspected on Oct 15th 2012.

Ring was approximately 3 mSv/hr on contact and 100 uSv/hr at 0.5 m.

Total dose accumulated during inspection on dosimeter 122 was 0.1 mSv

 

Attachment 1: TB22148_thru_ring_inspT2_15oct2012.pdf  233 kB  | Hide | Hide all
TB22148_thru_ring_inspT2_15oct2012.pdf
Attachment 2: TB22148_thru_ring_inspQ1_15oct2012.pdf  235 kB  | Show | Hide all
ELOG V2.9.2-2455