Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 110     Entry time: Monday, February 05, 2018, 15:40
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Repair 
Subject: 1A Q15 repair. 

1.) Completed covering up 1A Q15.

2.) RH flask currently contains the 8 insulators removed from Q15. 3.6 mSv/h on contact, 40-60 uSv/h @ .5 m. Double bagged. Bag exterior was swiped clean, inside was not checked (didn’t want to breach interior bag just to swipe components).

Attachment 1: 20180205_1aq15repair_P1030889.JPG  5.673 MB  | Hide | Hide all
20180205_1aq15repair_P1030889.JPG
ELOG V2.9.2-2455