Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 104     Entry time: Wednesday, March 08, 2017, 16:05
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Repair 
Subject: collimator joint repair 

Started uncovering the area above the T2 to Q13 joint:

 

Attachment 1: t2m920170308_114226_1136.jpg  84 kB  | Show | Show all
Attachment 2: t2m920170308_151426_1438.jpg  96 kB  | Show | Show all
ELOG V2.9.2-2455