Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ARIEL  Not logged in ELOG logo
Message ID: 8     Entry time: Friday, December 05, 2014, 10:43
Author: Isaac Earle 
Category: 100KW Beam Dump 
Type: Development 
Subject: Lower Lead Shield Drain Line Installed 

A 1/8" SS tube was routed from the Swagelok fitting on the front of the lower lead shield to the service stand water catch tray as shown in the attached photos.

The tube was routed to fit in the cut-out and chamfered corner gaps of block TSH0387 in the de-rated EHDT shielding assembly TSH0293.

Attachment 1: IMG_4383.JPG  175 kB  | Show | Show all
Attachment 2: IMG_4384.JPG  164 kB  | Show | Show all
Attachment 3: IMG_4385.JPG  159 kB  | Show | Show all
ELOG V2.9.2-2455