Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ARIEL  Not logged in ELOG logo
Message ID: 89     Entry time: Wednesday, April 23, 2025, 13:40
Author: Aaron Tam 
Category: Hot Cell 1 
Type: Development 
Subject: APTW Front End Gate Valve Assembly Installation 

 Previously prepped - A. Kong, S. Liu, A. Tam

  • Gate valve assembly put together
  •  All bolts torqued to >=55Nm
  • Gate valve Cart moved into hotcell

April 23, 2025 - A. Kong, C. Fisher, S. Liu, M. Genix, A. Tam 

  • Moved standoffs to the taller position on the cart
  • Weight added to cart to bring CG towards centre of cart.
    • Cart rolling away and hitting lip of lift table could tip (especially with gate valve in higher position)
  • Gate valve moved onto cart via 1000kg crane
    • Sling used between openings in gate valve assembly frame members
  • Complete gate valve assembly with hard stop and bellows movement retainer
  • Dust cover removed, sealing (o-ring) flange removed,
  • vacuum and sealing surfaces cleaned,
  • hard stops (gate valve – shield plug) installed, bellows limit brackets installed
  • Bagged all items removed to keep them clean

QDS seal installed BY HAND onto gate valve tapered flange

  • Seal tabs align with a cutout feature on the flange (3 tabs, 120O spacing @ 10:00, 2:00, 6:00)
  • These cutouts allow the tabs to bend towards the flange without obstructing sealing surfaces

RH Assumptions (UNTESTED)

  • in the situation of a gate valve assembly replacement:
    • Seal should be pre-installed onto gate valve flange using soft jawed clamps (bought, designed, modified)
    • Assembly should come bagged and bag removed at the point of installation to reduce contamination on  vacuum and sealing surfaces
  • if seal replacement on its own (eg. during extraction electrode replacement)
    • Seal should arrive on a clean stand through tool port and oriented in installation position
    • two manips to place seal onto flange; grabbing top two tabs (UNTESTED but confident because of taper on seal retainer)
    • clamps are TBD (bought, designed, modified)               

Installing gate valve assembly proposed sequence of operations:

  • Using Hotcell lift table, raise gate valve assembly so that Shield-plug-to-gate-valve screw can engage, leaving ~1/8 inch between Shield-plug and gate-valve-assembly
  • Slide gate-valve with cart into rough x-y position (use camera views for alignment)
  • Start thread on shield-plug-to-gate-valve screw, until weight is released from cart.
  • Release gate valve from cart by unscrewing 2 bolts holding it
  • Torque shield-plug-to-gate-valve screw fully to align hard-stop threaded holes
  • Lightly install hard-stop screws
  • Crack loosen the shield plug-gate valve screws
  • Final torque on hardstop screws
  • Final torque on shield plug-gate valve screws

Additional Notes:

  • Tested manipulator access/reach to the hard-stop screws)
    • (better access may be achieved by lowering torque tool handle)
  • Nut housing for shield plug to gate valve assembly screws/nuts not used as final bolts will react differently than test shield-plug

To be tested:

  • Gate valve seal clamping using torque multiplier and reaction arm.                                       

 

Attachment 1: IMG_1757.JPEG  621 kB  | Show | Hide all
Attachment 2: IMG_1754.JPEG  809 kB  | Show | Hide all
Attachment 3: IMG_1755.JPEG  873 kB  | Show | Hide all
Attachment 4: IMG_1756.JPEG  615 kB  | Show | Hide all
Attachment 5: IMG_1758.JPEG  574 kB  | Show | Hide all
Attachment 6: IMG_1758.JPEG  574 kB  Uploaded Wednesday, April 23, 2025, 14:41  | Show | Hide all
Attachment 7: IMG_1759.JPEG  417 kB  Uploaded Wednesday, April 23, 2025, 14:41  | Show | Hide all
Attachment 8: IMG_1760.JPEG  665 kB  Uploaded Wednesday, April 23, 2025, 14:42  | Show | Hide all
Attachment 9: IMG_1761.JPEG  657 kB  Uploaded Wednesday, April 23, 2025, 14:42  | Show | Hide all
Attachment 10: IMG_1762.JPEG  682 kB  Uploaded Wednesday, April 23, 2025, 14:42  | Show | Hide all
Attachment 11: IMG_1763.JPEG  776 kB  Uploaded Wednesday, April 23, 2025, 14:42  | Show | Hide all
Attachment 12: IMG_1764.JPEG  843 kB  Uploaded Wednesday, April 23, 2025, 14:43  | Show | Hide all
Attachment 13: PXL_20250423_162248763.jpg  669 kB  Uploaded Wednesday, April 23, 2025, 14:44  | Show | Hide all
Attachment 14: PXL_20250423_162303013.jpg  760 kB  Uploaded Wednesday, April 23, 2025, 14:44  | Show | Hide all
Attachment 15: PXL_20250423_162810876.jpg  439 kB  Uploaded Wednesday, April 23, 2025, 14:44  | Show | Hide all
Attachment 16: PXL_20250423_164508543.jpg  245 kB  Uploaded Wednesday, April 23, 2025, 14:45  | Show | Hide all
Attachment 17: PXL_20250423_170928423.jpg  506 kB  Uploaded Wednesday, April 23, 2025, 14:45  | Hide | Hide all
PXL_20250423_170928423.jpg
Attachment 18: PXL_20250423_170932751.jpg  734 kB  Uploaded Wednesday, April 23, 2025, 14:45  | Show | Hide all
Attachment 19: PXL_20250423_171017723.jpg  475 kB  Uploaded Wednesday, April 23, 2025, 14:46  | Show | Hide all
Attachment 20: PXL_20250423_172017347.jpg  755 kB  Uploaded Wednesday, April 23, 2025, 14:46  | Show | Hide all
Attachment 21: PXL_20250423_172722112.jpg  694 kB  Uploaded Wednesday, April 23, 2025, 14:46  | Show | Hide all
ELOG V2.9.2-2455