Message ID: 89
Entry time: Wednesday, April 23, 2025, 13:40
|
Author: |
Aaron Tam |
Category: |
Hot Cell 1 |
Type: |
Development |
Subject: |
APTW Front End Gate Valve Assembly Installation |
|
|
Previously prepped - A. Kong, S. Liu, A. Tam
- Gate valve assembly put together
- All bolts torqued to >=55Nm
- Gate valve Cart moved into hotcell
April 23, 2025 - A. Kong, C. Fisher, S. Liu, M. Genix, A. Tam
- Moved standoffs to the taller position on the cart
- Weight added to cart to bring CG towards centre of cart.
- Cart rolling away and hitting lip of lift table could tip (especially with gate valve in higher position)
- Gate valve moved onto cart via 1000kg crane
- Sling used between openings in gate valve assembly frame members
- Complete gate valve assembly with hard stop and bellows movement retainer
- Dust cover removed, sealing (o-ring) flange removed,
- vacuum and sealing surfaces cleaned,
- hard stops (gate valve – shield plug) installed, bellows limit brackets installed
- Bagged all items removed to keep them clean
QDS seal installed BY HAND onto gate valve tapered flange
- Seal tabs align with a cutout feature on the flange (3 tabs, 120O spacing @ 10:00, 2:00, 6:00)
- These cutouts allow the tabs to bend towards the flange without obstructing sealing surfaces
RH Assumptions (UNTESTED)
- in the situation of a gate valve assembly replacement:
- Seal should be pre-installed onto gate valve flange using soft jawed clamps (bought, designed, modified)
- Assembly should come bagged and bag removed at the point of installation to reduce contamination on vacuum and sealing surfaces
- if seal replacement on its own (eg. during extraction electrode replacement)
- Seal should arrive on a clean stand through tool port and oriented in installation position
- two manips to place seal onto flange; grabbing top two tabs (UNTESTED but confident because of taper on seal retainer)
- clamps are TBD (bought, designed, modified)
Installing gate valve assembly proposed sequence of operations:
- Using Hotcell lift table, raise gate valve assembly so that Shield-plug-to-gate-valve screw can engage, leaving ~1/8 inch between Shield-plug and gate-valve-assembly
- Slide gate-valve with cart into rough x-y position (use camera views for alignment)
- Start thread on shield-plug-to-gate-valve screw, until weight is released from cart.
- Release gate valve from cart by unscrewing 2 bolts holding it
- Torque shield-plug-to-gate-valve screw fully to align hard-stop threaded holes
- Lightly install hard-stop screws
- Crack loosen the shield plug-gate valve screws
- Final torque on hardstop screws
- Final torque on shield plug-gate valve screws
Additional Notes:
- Tested manipulator access/reach to the hard-stop screws)
- (better access may be achieved by lowering torque tool handle)
- Nut housing for shield plug to gate valve assembly screws/nuts not used as final bolts will react differently than test shield-plug
To be tested:
- Gate valve seal clamping using torque multiplier and reaction arm.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|