Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ARIEL  Not logged in ELOG logo
Message ID: 70     Entry time: Thursday, October 17, 2024, 11:34
Author: Albert Kong 
Category: Hot Cell 1 
Type: Development 
Subject: Tarping completed on hot cell roof 

Two tarps were installed above the hot cell roof to protect against concrete dust while testing in the hot cell.

Zip ties were used to hook the tarp onto tubing brackets on the back wall.

Attachment 1: 90ab24ac-d55b-43ac-8630-02cd9ca2df85.jpg  73 kB  | Show | Show all
Attachment 2: IMG_0325.JPEG  616 kB  | Show | Show all
Attachment 3: IMG_0326.JPEG  680 kB  | Show | Show all
ELOG V2.9.2-2455