Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ARIEL  Not logged in ELOG logo
Message ID: 34     Entry time: Tuesday, May 16, 2017, 17:30
Author: Jason Kapalka 
Category: T-Hall Crane 
Type: Development 
Subject: ARIEL Target Hall Overhead Crane Measurements 
On May 5, 2017 the Beamlines and Remote Handling groups recorded distances in the ARIEL Target Hall from the Target Pit floor and B1 Target Hall floor elevations up to the overhead crane girders and main hoist rotation plate using a laser measurement device (see attached file). On May 19, 2017, the Beamlines Group measured the B1 and Target Pit floor elevations relative to the Cyclotron centre (see attached file).
Attachment 1: ARIEL_Target_Hall_Overhead_Crane_Measurements_(20170505).pdf  83 kB  | Hide | Hide all
ARIEL_Target_Hall_Overhead_Crane_Measurements_(20170505).pdf
Attachment 2: Email_-_Michael_Vogel_-_ARIEL_B1_&_Target_Pit_floor_heights_(20170519).pdf  78 kB  Uploaded Tuesday, May 23, 2017, 15:19  | Show | Hide all
ELOG V2.9.2-2455