|
ID |
Date |
Target |
Number |
Source |
Status |
Subject |
category |
Text |
|
|
1
|
Wednesday, March 23, 2011, 20:57 |
| | | | e-log checks out | | test great - thank you very much
for setting up the e-logs for the targets
& ion sources group's hot-lab equipment |
|
|
2
|
Thursday, April 07, 2011, 15:46 |
| | | | Ta foils | | March 22, 2010:
More Ta foils are needed to make
the backup Ta Hp surface (w.o#38295-4). |
|
|
3
|
Thursday, May 12, 2011, 16:16 |
| | | | SiC#26-HP-FEBIAD discs | | May2, 2011: Laser cut SiC cast#1
but the size was wrong. It turned out
to be too large to fit in the target oven |
|
|
4
|
Monday, May 16, 2011, 17:55 |
| | | | SiC-HP-FEBIAD discs (spare target) | | Mon May 16 17:54:03 2011: SiC cast#7,
#6, #9, and #10 were laser cut at 18.50mm
in diameter. The discs are used for |
|
|
5
|
Tuesday, September 06, 2011, 11:23 |
TaC | TaC#1 | LP-SIS | | Laser cut TaC | | D-shape TaC, 18.5mm-14.5mm: 2 Casts
were cut.
Use file D-shape-car-1850 |
|
|