57
|
Monday, April 15, 2024, 10:52 |
Aaron Schmidt | Fixed | | Ar Glove box RP swapped. | Monday, April 15, 2024, 10:50: The
old IDP15 RP was not pumping the antechamber
down properly. An exchange IDP15 pump is |
|
59
|
Thursday, July 11, 2024, 13:40 |
Aaron Schmidt | | | Q2 - 2024 Ball Mill Calibration & Inspection | Fritsch Pulverisette
5 Ball Mill status: |
|
63
|
Thursday, November 21, 2024, 11:48 |
Aaron Schmidt | | | Change glove on Ar Glove box (2) | Thursday, November 21, 2024, 11:46:
2 Glovebox gloves were changed. The far right
glove & the far left glove. |
|
64
|
Monday, December 16, 2024, 12:15 |
Aaron Schmidt | Completed | | Q4 - 2024 Ball Mill Calibration & Inspection | Fritsch Pulverisette
5 Ball Mill status: |
|
|