ID Date Authordown Status Test Subject Text Attachments
  57   Monday, April 15, 2024, 10:52 Aaron SchmidtFixed Ar Glove box RP swapped. Monday, April 15, 2024, 10:50: The
old IDP15 RP was not pumping the antechamber
down properly. An exchange IDP15 pump is
  
  59   Thursday, July 11, 2024, 13:40 Aaron Schmidt  Q2 - 2024 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
 Q2_-2024_Ball_Mill_Calibration_&_inspection.jfifQ2_-_2024_Clean_up.jfif 
  63   Thursday, November 21, 2024, 11:48 Aaron Schmidt  Change glove on Ar Glove box (2) Thursday, November 21, 2024, 11:46:
2 Glovebox gloves were changed. The far right
glove & the far left glove. 
  
  64   Monday, December 16, 2024, 12:15 Aaron SchmidtCompleted Q4 - 2024 Ball Mill Calibration & Inspection  Fritsch Pulverisette
5 Ball Mill status:
 Q4_-_2024_Ball_Mill_Calibration&_Inspection.png 