Friday, September 27, 2019, 13:55, Aaron Schmidt, , , DI water supply leak outside room 06 - ISAC B1
|
Friday, September 27, 2019, 13:54:
There is a pin hole water leak coming from the DIW supply pipe going into the ISAC B1 hot lab - rm 06. It appears to be on the solder / joint.
The leak is very small at this point. Mostly just a drip. |
Wednesday, December 18, 2019, 13:50, Aaron Schmidt, , , Q4-2019 Ball Mill calibration & inspection
|
Fritsch Pulverisette 5 Ball Mill status:
Wednesday, December 18, 2019, 13:48:
SN 05.6010 / 03005: Inspected. Ok |
Wednesday, April 08, 2020, 11:40, Anders Mjos, , , Lab check in
|
Checked in on the labs and other equipment yesterday. Everything looks ok, including the glove box Ar supply. Recorded O2 and H2O values in the log book. |
Friday, April 24, 2020, 16:27, Anders Mjos, , , Lab check in
|
Anders Mjos wrote:
Checked in on the labs and other equipment yesterday. Everything looks ok, including the glove box Ar |
Monday, July 13, 2020, 11:07, Aaron Schmidt, , , Eye wash temp
|
Temp was noted to be high @ 50 deg C.
Adjusted the regulators to 35 deg C. Ran both the eye-wash station & shower. Waited 20 minutes. Ran them again and tuned.
Monday, July 13, 2020, 10:00: Complete. |
Monday, July 13, 2020, 11:23, Aaron Schmidt, , , Q2 - 2020 Ball mill inspection
|
Fritsch Pulverisette
5 Ball Mill status:
Monday, July 13, 2020, 11:22: |
Wednesday, September 16, 2020, 10:42, Aaron Schmidt, , , Ball Mill troubleshoot.
|
Odd noises reported. Darwin & Marla. "Like a rock caught in a fan"
AS - Re-installed bolts to run. Note, balancing feet underneath were uneven. Especially the front right foot was roughly 3/8" out of
position. No jars installed. |
Friday, December 04, 2020, 12:58, Aaron Schmidt, , , Q4 - 2020 Ball Mill Calibration & Inspection
|
Fritsch Pulverisette 5 Ball Mill status:
Monday, July 13, 2020, 11:22: |
Tuesday, February 09, 2021, 06:56, Aaron Schmidt, , , Planned power outage.
|
Tuesday, February 09, 2021, 06:53: Evaporator 2 off. Evaporator 1 ok, Fume hoods ok. Ar glove box off. Ready for planned power outage.
Should last from 0800 to1200.
Tuesday, February 09, 2021, 11:30: Confirmation there was no EF14/15 trip. Ar Glove box on. Evaporator 2 back on. |
Tuesday, August 03, 2021, 10:34, Aaron Schmidt, , , Q2 - 2021 Ball Mill Calibration & Inspection
|
Fritsch Pulverisette 5 Ball
Mill status: |
Tuesday, December 07, 2021, 09:23, Aaron Schmidt, , , Q4 - 2021 Ball Mill Calibration & Inspection
|
Tuesday, December 07, 2021, 09:23:
SN 05.6010 / 03005: Inspected. Ok
|
Thursday, January 20, 2022, 13:38, Carla Babcock, , , Testing of spare FUG bias supply
|
Tomislav and John Chow tested the spare bias supply located in the rack of the electrical services room. This is a FUG HCN 1400 M-60000, serial 11590-01-01,
PO TR131986 but when it was installed online we found it could not go above about 40kV. It was replaced but not tested until now. Tomislav says:
"We started testing the FuG this morning, in manual mode it is possible to reach 60 kV, 59.75 according to the display and with |
Tuesday, July 12, 2022, 11:08, Aaron Schmidt, , , Q2 - 2022 Ball Mill Calibration & Inspection
|
Fritsch Pulverisette 5 Ball Mill status:
Tuesday, July 12, 2022, 11:06:
SN 05.6010 / 03005: Inspected. Ok |
Friday, December 16, 2022, 07:36, Aaron Schmidt, , , Q4 - 2022 Ball Mill Calibration & Inspection
|
Fritsch Pulverisette 5 Ball Mill status:
Friday, December 16, 2022, 07:35
SN 05.6010 / 03005: Inspected. Ok |
Thursday, February 02, 2023, 10:30, Aaron Schmidt, , , Eyewash & Shower Station OK
|
Thursday, February 02, 2023, 10:14: Cold Lab Eyewash & shower station ran. Ok. |
Friday, June 30, 2023, 12:21, Aaron Schmidt, , , Q2 - 2023 Ball Mill Calibration & Inspection
|
Fritsch Pulverisette
5 Ball Mill status:
Friday, June 30, 2023, 12:20: |
Tuesday, August 01, 2023, 12:31, Darwin Ortiz Rosales, , , Evap1 and Evap2 Inspection and Maintenance
|
Evap1: Cleaned and checked seals. Oil level could not be clearly determined, but are consulting with pump group to check.
Evap2: Cleaned and checked seals. |
Tuesday, December 12, 2023, 13:12, Aaron Schmidt, , , Q4 - 2023 Ball Mill Calibration & Inspection
|
Fritsch
Pulverisette 5 Ball Mill status:
Tuesday, December 12, 2023, 13:11: |
Friday, February 09, 2024, 11:01, Aaron Schmidt, , , Laser cutter inspection
|
Friday, February 09, 2024, 11:01: Epilog laser cutter operates. OK |
Wednesday, March 27, 2024, 13:42, Keyur Chauhan, , , Actinide Mass Balance Calibration ISAC-I B1 Hot Lab
|
ISAC-1 B1 Hot Lab actinide mass balance calibration was carried
out on March 27, 2024, at 11:10 a.m. with an accuracy of 0.00%. |
|