Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Lab Maintenance, Page 2 of 4  Not logged in ELOG logo
Entry  Wednesday, December 20, 2017, 09:16, Laura Lambert, , , RETURN and SUPPLY valves CLOSED for xmas break for both evap1 and evap2 
Entry  Tuesday, January 23, 2018, 11:58, Laura Lambert, , , All BeO removed from Labs! 
Entry  Wednesday, January 31, 2018, 13:35, Laura Lambert, , , New lab safety mirrors installed in hot lab IMG_0237.JPGIMG_0239.JPG
Entry  Monday, April 09, 2018, 15:59, Laura Lambert, Fixed, , Glove box leak in hot lab GetImage.jpgGetImage_(1).jpgGetImage_(2).jpgGetImage_(3).jpg
Entry  Thursday, February 07, 2019, 10:42, Aaron Schmidt, , , Argon Glove box leak / regeneration failure 7x
Entry  Thursday, March 21, 2019, 07:43, Aaron Schmidt, , , Argon Glove box repair & link to nuclear ventilation 6x
Entry  Wednesday, April 24, 2019, 10:19, Aaron Schmidt, Fixed, , Cold Lab back sink leak 
Entry  Friday, July 26, 2019, 13:06, Aaron Schmidt, , , Q2 - 2019 Ball Mill Calibration & Inspection Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf
Entry  Friday, September 27, 2019, 13:55, Aaron Schmidt, , , DI water supply leak outside room 06 - ISAC B1 ISAC_B1_leak_-_1.jpegISAC_B1_leak_-_2.jpegISAC_B1_leak_-_4.jpegISAC_B1_leak_-_5.jpg
Entry  Wednesday, December 18, 2019, 13:50, Aaron Schmidt, , , Q4-2019 Ball Mill calibration & inspection Q4_-_2019_Ball_Mill_Calibration_&_Inspection.pdf
Entry  Monday, January 13, 2020, 13:27, Aaron Schmidt, Under Process, , Leaking pipe in HC area Leak_location.jpg20200113_113443.jpg20200113_120206.jpg
Entry  Wednesday, April 08, 2020, 11:40, Anders Mjos, , , Lab check in 
    Reply  Friday, April 24, 2020, 16:27, Anders Mjos, , , Lab check in 20200422_154045506_iOS.jpg
Entry  Monday, July 13, 2020, 11:07, Aaron Schmidt, , , Eye wash temp 
Entry  Monday, July 13, 2020, 11:23, Aaron Schmidt, , , Q2 - 2020 Ball mill inspection Q2_-_2020_Ball_Mill_Calibration_&_Inspection.pdf
Entry  Wednesday, September 16, 2020, 10:42, Aaron Schmidt, , , Ball Mill troubleshoot. 
Entry  Friday, December 04, 2020, 12:58, Aaron Schmidt, , , Q4 - 2020 Ball Mill Calibration & Inspection Q4_-_2020_Ball_Mill_Calibration_&_Inspection.pdf
Entry  Tuesday, February 09, 2021, 06:56, Aaron Schmidt, , , Planned power outage. 
Entry  Tuesday, August 03, 2021, 10:34, Aaron Schmidt, , , Q2 - 2021 Ball Mill Calibration & Inspection  Q2_-_2021_Ball_Mill_Calibration_&_Inspection.pdf
Entry  Tuesday, December 07, 2021, 09:23, Aaron Schmidt, , , Q4 - 2021 Ball Mill Calibration & Inspection  Q4_-_2021_Ball_Mill_Calibration_&_Inspection.pdf
ELOG V2.9.2-2455