Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Lab Maintenance  Not logged in ELOG logo
Message ID: 56     Entry time: Wednesday, March 27, 2024, 13:42
Author: Keyur Chauhan 
Status:  
Test:  
Subject: Actinide Mass Balance Calibration ISAC-I B1 Hot Lab 

 ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on March 27, 2024, at 11:10 a.m. with an accuracy of 0.00%.

Attachment 1: Actinide_Mass_Balance_-_27_Mar_2024.pdf  62 kB  | Hide | Hide all
Actinide_Mass_Balance_-_27_Mar_2024.pdf
ELOG V2.9.2-2455