Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Lab Maintenance  Not logged in ELOG logo
Message ID: 26     Entry time: Friday, July 26, 2019, 13:06
Author: Aaron Schmidt 
Status:  
Test:  
Subject: Q2 - 2019 Ball Mill Calibration & Inspection 

 Fritsch Pulverisette 5 Ball Mill status:

SN 05.6010 / 03005: Inspected July 5, 2019. Ok

 

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

 

See attached.

Attachment 1: Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf  217 kB  | Hide | Hide all
Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf
ELOG V2.9.2-2455