Entry  Wednesday, August 06, 2014, 16:10, John Wong, Ta, 38817-9, HP-SIS, In progress, Conditioning Ta target 
Wednesday, August 06, 2014, 15:59
Target consists of 400 Ta discs. 
Total packed length 4.5cm
Entry  Tuesday, September 23, 2014, 15:02, Laura Lambert, Empty, 40282-5, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating 
 Tuesday, September 23, 2014, 15:00
A new target boat [new design with no end caps] was sprayed with TaC coating and let dry.
The target boat is wrapped with 3-layers of Ta-heat shield.
Entry  Thursday, October 02, 2014, 11:52, Laura Lambert, Empty, 40282-5, LP-SIS, In progress, Sintering TaC coating container for UCx#11 
 Thursday, October 02, 2014, 11:51
Target container sprayed with TaC, currently drying in fume hood

 Monday, October 06, 2014, 12:11
    Reply  Monday, October 06, 2014, 12:17, John Wong, Empty, 40282-5, LP-SIS, In progress, Sintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR) 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, October 02, 2014, 11:51
Entry  Thursday, October 09, 2014, 15:59, John Wong, Nb, , TARGET BOAT, In progress, Conditioning Nb target (for Bob)  
Thursday, October 09, 2014, 15:56
The target boat contains 5 samples of Nb discs.  Each disc is wrapped with Nb foil and labelled. 
Samples will be heated up to 1400C for 4 hours. 
Entry  Thursday, October 23, 2014, 15:38, Laura Lambert, SiC, 39530-8, HP-FEBIAD, In progress, Testing the new OMEGA-IR2C on SiC#31 target 2014-10-23_15.12.56.jpg2014-10-24.jpeg
 Thursday, October 23, 2014, 15:34
*See elog #142 for target description*
one endcap still in place, one removed for OMEGA-IR2C beam to reach material [see pic]
Entry  Tuesday, November 04, 2014, 16:20, John Wong, SiC, , TARGET BOAT, In progress, TEST: Fabrication of SiC & Determine phase transformation 3C vs 6H 
Tuesday, November 04, 2014, 16:08
The purpose of this experiment is to improve the fabrication of SiC.  Previously, the SiC target was heated to 2000c and yellow crystals were
observed.
Entry  Monday, February 02, 2015, 16:33, John Wong, Empty, 41077-2, LP-SIS, In progress, Coating/Sintering TaC on target container - For Graphite Insert  
Monday, February 02, 2015, 16:28
Container is coated with TaC.  No Ta foil wrapped around. 
Chamber is being pumped down.
    Reply  Tuesday, February 03, 2015, 10:31, Laura Lambert, Empty, 41077-2, LP-SIS, In progress, Coating/Sintering TaC on target container - For Graphite Insert  


    
        
            John Wong wrote:
        
        
            
            Monday, February 02, 2015, 16:28
    Reply  Thursday, February 05, 2015, 18:03, John Wong, Empty, 41077-2, LP-SIS, In progress, Coating/Sintering TaC on target container - For Graphite Insert  


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
Entry  Monday, March 09, 2015, 16:50, Laura Lambert, Ta, 38817-5, HP-SIS, In progress, Conditioning Ta target first_ramp_up.JPGsecond_ramp_up_with_Ta_heat_shields.JPG
 Monday, March 09, 2015, 16:47
Target consists of 400 discs.
Total packed length 3.4cm
Entry  Friday, April 17, 2015, 16:14, Laura Lambert, SiC, 38817-7, HP-SIS, In progress, Sintering SiC#31 
 Friday, April 17, 2015, 16:01
Total number of foils: 520 discs
Total mass of materials [incl graphite foils]: 60.2441g
Entry  Friday, May 01, 2015, 10:50, Laura Lambert, , 40282-4, TARGET BOAT, In progress, Sintering four different ZrC samples 1.jpg2015-04-30_15.24.57.jpg
 Friday, May 01, 2015, 10:27
Four different samples of ZrC are loaded into a target boat.
Sample A: ZrC + NO graphite / hand cut
    Reply  Monday, May 04, 2015, 17:26, John Wong, , 40282-4, TARGET BOAT, In progress, Sintering four different ZrC samples 


    
        
            Laura Lambert wrote:
        
        
            
             Friday, May 01, 2015, 10:27
Entry  Friday, May 22, 2015, 11:44, Laura Lambert, Empty, , TARGET BOAT, In progress, Sintering TaC coating on Ta target boat 
 Friday, May 22, 2015, 11:43
A target boat was sprayed with TaC coating and let dry yesterday.
The target boat is wrapped with 3-layers of Ta-heat shield.
    Reply  Monday, May 25, 2015, 17:08, John Wong, Empty, 40282-5, TARGET BOAT, In progress, Sintering TaC coating on Ta target boat 


    
        
            Laura Lambert wrote:
        
        
            
             Friday, May 22, 2015, 11:43
Entry  Tuesday, May 26, 2015, 13:57, Laura Lambert, Endcaps, 40282-5, TARGET BOAT, In progress, Sintering TaC coating on Ta endcaps endcaps_-_may_26.jpg
 Tuesday, May 26, 2015, 13:06
Endcaps were sprayed with TaC coating and let dry.
Each endcap is wrapped separately with a sheet of graphite foil and stacked in the target boat [see image]
    Reply  Wednesday, May 27, 2015, 17:58, John Wong, Endcaps, 40282-5, TARGET BOAT, In progress, Sintering TaC coating on Ta endcaps 


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, May 26, 2015, 13:06
Entry  Thursday, May 28, 2015, 11:36, Laura Lambert, Endcaps, 40282-5, TARGET BOAT, In progress, Sintering TaC coating on Ta endcaps - round 2 endcaps_-_may_28_-_round2.jpg
 Thursday, May 28, 2015, 11:34
Endcaps were sintered [see elog#199]
A Ta foil is placed in the target boat with separate slots for each endcap [see image]
Entry  Friday, May 29, 2015, 11:29, Laura Lambert, ZrC, 41177-1, LP-SIS, In progress, Conditioning ZrC#7 
 Friday, May 29, 2015, 11:21
Total number of foils: 425 discs
Total mass of materials [incl graphite foils]: 44.41g