Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 6 of 34  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  152   Wednesday, August 06, 2014, 16:10 John WongTa38817-9HP-SISIn progressConditioning Ta targetWednesday, August 06, 2014, 15:59
Target consists of 400 Ta discs. 
Total packed length 4.5cm
  
  156   Tuesday, September 23, 2014, 15:02 Laura LambertEmpty40282-5TARGET BOATIn progressSintering Ta target boat with TaC coating Tuesday, September 23, 2014, 15:00
A new target boat [new design with
no end caps] was sprayed with TaC coating
  
  160   Thursday, October 02, 2014, 11:52 Laura LambertEmpty40282-5LP-SISIn progressSintering TaC coating container for UCx#11 Thursday, October 02, 2014, 11:51
Target container sprayed with TaC,
currently drying in fume hood
  
  162   Monday, October 06, 2014, 12:17 John WongEmpty40282-5LP-SISIn progressSintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR)

    

       
            
  
  164   Thursday, October 09, 2014, 15:59 John WongNb TARGET BOATIn progressConditioning Nb target (for Bob) Thursday, October 09, 2014, 15:56
The target boat contains 5 samples
of Nb discs.  Each disc is wrapped with
  
  167   Thursday, October 23, 2014, 15:38 Laura LambertSiC39530-8HP-FEBIADIn progressTesting the new OMEGA-IR2C on SiC#31 target Thursday, October 23, 2014, 15:34
*See elog #142 for target description*
one endcap still in place, one removed
 2014-10-23_15.12.56.jpg2014-10-24.jpeg 
  168   Tuesday, November 04, 2014, 16:20 John WongSiC TARGET BOATIn progressTEST: Fabrication of SiC & Determine phase transformation 3C vs 6HTuesday, November 04, 2014, 16:08
The purpose of this experiment is
to improve the fabrication of SiC. 
  
  176   Monday, February 02, 2015, 16:33 John WongEmpty41077-2LP-SISIn progressCoating/Sintering TaC on target container - For Graphite Insert Monday, February 02, 2015, 16:28
Container is coated with TaC. 
No Ta foil wrapped around. 
  
  177   Tuesday, February 03, 2015, 10:31 Laura LambertEmpty41077-2LP-SISIn progressCoating/Sintering TaC on target container - For Graphite Insert

    

       
            
  
  178   Thursday, February 05, 2015, 18:03 John WongEmpty41077-2LP-SISIn progressCoating/Sintering TaC on target container - For Graphite Insert

    

       
            
  
  183   Monday, March 09, 2015, 16:50 Laura LambertTa38817-5HP-SISIn progressConditioning Ta target Monday, March 09, 2015, 16:47
Target consists of 400 discs.
Total packed length 3.4cm
 first_ramp_up.JPGsecond_ramp_up_with_Ta_heat_shields.JPG 
  186   Friday, April 17, 2015, 16:14 Laura LambertSiC38817-7HP-SISIn progressSintering SiC#31 Friday, April 17, 2015, 16:01
Total number of foils: 520 discs
  
  188   Friday, May 01, 2015, 10:50 Laura Lambert 40282-4TARGET BOATIn progressSintering four different ZrC samples Friday, May 01, 2015, 10:27
Four different samples of ZrC are
loaded into a target boat.
 1.jpg2015-04-30_15.24.57.jpg 
  189   Monday, May 04, 2015, 17:26 John Wong 40282-4TARGET BOATIn progressSintering four different ZrC samples

    

       
            
  
  194   Friday, May 22, 2015, 11:44 Laura LambertEmpty TARGET BOATIn progressSintering TaC coating on Ta target boat Friday, May 22, 2015, 11:43
A target boat was sprayed with
  
  195   Monday, May 25, 2015, 17:08 John WongEmpty40282-5TARGET BOATIn progressSintering TaC coating on Ta target boat

    

       
            
  
  197   Tuesday, May 26, 2015, 13:57 Laura LambertEndcaps40282-5TARGET BOATIn progressSintering TaC coating on Ta endcaps Tuesday, May 26, 2015, 13:06
Endcaps were sprayed with TaC coating
and let dry.
 endcaps_-_may_26.jpg 
  198   Wednesday, May 27, 2015, 17:58 John WongEndcaps40282-5TARGET BOATIn progressSintering TaC coating on Ta endcaps

    

       
            
  
  200   Thursday, May 28, 2015, 11:36 Laura LambertEndcaps40282-5TARGET BOATIn progressSintering TaC coating on Ta endcaps - round 2 Thursday, May 28, 2015, 11:34
Endcaps were sintered [see elog#199]
 endcaps_-_may_28_-_round2.jpg 
  203   Friday, May 29, 2015, 11:29 Laura LambertZrC41177-1LP-SISIn progressConditioning ZrC#7 Friday, May 29, 2015, 11:21
Total number of foils: 425 discs
  
ELOG V2.9.2-2455