Entry  Thursday, August 08, 2013, 15:41, Laura Lambert, NiO, 39530-6, HP-FEBIAD, In progress, Sintering NiO # 2 NiO#2.PNG
    Reply  Thursday, August 08, 2013, 17:28, John Wong, NiO, 39530-6, HP-FEBIAD, Done, Sintering NiO # 2 
Message ID: 80     Entry time: Thursday, August 08, 2013, 15:41     Reply to this: 81
Author: Laura Lambert 
Target Material: NiO 
Target Oven W.O#: 39530-6 
Source: HP-FEBIAD 
Status: In progress 
Subject: Sintering NiO # 2 

Thursday, August 08, 2013, 15:19

NiO target materials loaded into the container yesterday.

Total discs = 530, (5 discs/pack)

length [after loaded] = 9.0cm

Target container is wrapped with Ta-heat shields, and will be removed after sintering process.

No end caps were inserted.

The chamber has been pumped down and currently IG1 = 3.8x10-06 Torr.

The HS cooling water was turned on and no leaks were detected.

TGHT and TBHT have been stepped up to 50A.

Auto-ramping setting:

0.2A/min for TGHT max = 250A, TBHT max = 230A.

Good vacuum = 3.00e-05 Torr

Bad vacuum = 4.00e-05 Torr

**See attachment #1 for pictures of target pre-sintering


 

Attachment 1: NiO#2.PNG  2.252 MB  Uploaded Thursday, August 08, 2013, 17:13  | Hide | Hide all
NiO#2.PNG