Thursday, June 26, 2025, 14:24
A boat wrapped in 4 Ta heatshields + Ta pouch
Sintering S1.3s (x2), bare Ta (0.3s)
Vacuum IGP1 initial = ~1.40 e-06
Target temperature on OMEGA= 1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final TGHT current= ~450A (adjustable)
1A/min to =450 A TGHT
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Friday, June 27, 2025, 06:12
Started ramp @1A/min
Friday, June 27, 2025, 10:14
Inc ramp to @2A/min. First outgas occurred around ~7:30AM
Friday, June 27, 2025, 12:05
OMEGA reads 1855C at 441A. Increasing final value to 460A.
Friday, June 27, 2025, 12:15
OMEGA reads 1881C at 451A. Increasing final value to 465A.
Friday, June 27, 2025, 12:17
Manually increased current until OMEGA read 1900C, current 459A
Hold for 4hr
Friday, June 27, 2025, 16:15
Ramp down -2A/min |