Message ID: 651     Entry time: Thursday, December 14, 2023, 09:58
Author: Darwin Ortiz Rosales 
Target Material: SiC 
Target Oven W.O#: 41369-2 
Source: HP-SIS 
Status: Done 
Subject: 231208SiC conditioning 

Thursday, December 14, 2023, 09:53

Target left pumping down in Evap2 overnight. 

Initial weight including protective jig = 1474.3 g

Total number of target foils:388 

 10 analysis discs: 5x 220727-2 labelled as A and 5x 231123-2 labelled as B on the right side (front) of container.  Order of discs ABABABABAB.

Total length packed 15.5 cm

container has 3 Ta heat shields including the inner made of three pieces as to cover the center block.

No endcaps inserted to facilitate out-gassing

Ta coated spring at  both ends

ramp to 500A @ 1A/min TGHT and to 230A on TBHT

max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)

Then temperature = 1800C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 5.00 e -4 Torr

Bad vac at 5.00 e-2 Torr

 IGP1= 9.3e-07 Torr at start of initial ramp.


Thursday, December 14, 2023, 09:56

Started initial ramp up 1A/min on both heaters


Thursday, December 14, 2023, 11:03

Pressure dropping.  Will increase ramp speed to 2A/min on both heaters (1A/30s)


Thursday, December 14, 2023, 11:17

pressure dropping.  Increase ramp to 4A/min (2A/30s)

Will stop and ramping for temperature measurements


Thursday, December 14, 2023, 13:28

Increased ramp to 5A/min (2.5A/30s)

 Will heat to 703A on TGHT and leave for 4 hours