Monday, February 18, 2013, 16:28
The RFQ target container is coated with TaC and ready to be sintered. No Ta-heat shields are used. This container will be used for the SiC#28-LPSIS-RFQ.
Two thermocouples are welded on the container: One on the end cap and the other on the back block (see attachment#1)
The target will be heated to at least TGHT at 580A and TBHT at 300A; the vacuum and gasses will be monitored.
The chamber is currently being pumped down...
Friday, February 22, 2013, 14:24
The gasses were analyzed with the RGA:
TGHT @ 520A, TBHT @ 300A: Mass 28 (CO) reached to max current of ~5pA before the current started to decrease, (see attachment #2). This could be the indication of the material(s) in the target container was "sort of" fully reduced.
TGHT was further ramped up to 600A and heated for a few hours. The temperature on the end was measured at 1252C and the center block was at 1580C. (see attachment #3).
The container was successfully sintered with TaC.
|