Message ID: 51     Entry time: Wednesday, October 10, 2012, 16:37
Author: John Wong 
Target Material: Empty 
Target Oven W.O#: 39165-4 
Source: LP-SIS 
Status: Done 
Subject: Coating target oven /w TaC & sintering for TiC#3 

Wednesday, October 10, 2012, 16:35

Target container is coated with TaC.  No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min.

TBHT will be ramped up to 230A at 0.2A/min.

Chamber is currently being pumped down


 Wednesday, October 10, 2012, 17:31

Chamber was pumped down to mid 10-6 Torr.  HS water valve was opened and no leak in vacuum was observed.

TGHT and TBHT were stepped up to 30A.  Everything seems fine...

Initiated auto-ramping:  Good vac = 2.0e-5 torr, Bad Vac = 3.0e-5 Torr. 


 Thursday, October 11, 2012, 10:35

TBHT has reached to 230A, 3.52V. 

TGHT has reached to 232A.  Vacuum is stabilizing at 8.0e-7 Torr, BP at 19 mTorr. 

Increased TGHT ramping rate to 2.0A/min. 


 Thursday, October 11, 2012, 14:55

TGHT reached to 580A/9.95V, local 575A/10.03V. 

TGHT at 230A/3.62V

Local target container temperature measured at ~1430C, central block at ~1220C

IGP1 currently at 1.68e-6 Torr. 

Heaters will be remained on for another 2 hours or so before auto-cooling is initiated.


 Thursday, October 11, 2012, 17:49

Target container has been heated for over 4 hrs.

IGP1 @ 1.10e-6 Torr, BP @ 18mTorr

Auto-cooling initiated, rate @ 2A/min.


 Friday, October 12, 2012, 10:02

TBHT/TGHT have reached to zero current. 

P/S off.

Venting chamber..

see attachment#1: striptool archiver


 Tuesday, October 16, 2012, 10:35

Container looks good.  It will be used for TiC#3


 

Attachment 1: striptool_archiver_container_TaC_coating.PNG  27 kB  Uploaded Friday, October 12, 2012, 11:07  | Hide | Hide all
striptool_archiver_container_TaC_coating.PNG