Tuesday, February 21, 2017, 15:19
Container coated with TaC using 'flushing technique' and let dry overnight.
Cleaned ionizer tube with acetone, no coating inside ionizer tube
Wrapped with 3 x Ta heat shields, incl center block
Currently pumping down in evap2
OMEGA slope = 0.98
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
Wednesday, February 22, 2017, 09:41
HS water valves opened, no leaks detected.
Tapped up manually to 35A
Waited ~45min
Vacuum stable.
IGP1 = 1.2e-6 Torr
Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 350A
Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A
Once max setpoints achieved, will tap up manually to final desired temperature of 1900C
Friday, February 24, 2017 by Anders
Continue manually to 1900 C
Friday, February 24, 2017, 16:24: TGHT at 400 A 6.35V IG1 = 4.5e-7 Torr 1660 C
Friday, February 24, 2017, 16:57: TGHT at 410 A 6.6 V IG1 = 5.0e-7 Torr 1700 C
Sunday, February 26, 2017 by Anders
Sunday, February 26, 2017, 14:13: TGHT at 425 A 6.9 V IG1 = 2.5e-7 Torr
Lab closed for weekend. No access to temp reading.
Monday, February 27, 2017, 16:12
Tapped up manually to 1900C this morning.
TGHT = 490A, 8.14V
TBHT = 230A, 2.98V
MIKRON = 1911C
OMEGA = 1904C
evap2 has remained at max setpoints for ~6hrs
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Tuesday, February 28, 2017, 11:57
Container finished sintering.
Vented in air and opened up this morning.
Container looks good
|