Wednesday, September 28, 2016, 17:08
Container coated with TaC using 'flushing technique' today, cleaned ionizer tube with acetone, no coating inside ionizer tube
Dried by blowing air into tube
Wrapped with 3 x Ta heat shields, incl center block - new method of each layer being one long single Ta foil covering entire container incl center block
Currently pumping down in evap2
Thursday, September 29, 2016, 11:11
HS water valves opened
Tapped up to 35A
Waited ~45min, vacuum stable
IGP1 = 1.4e-6 Torr
Initiating auto ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Max setpoints for TGHT = 350A and TBHT = 230A
Once max setpoints achieved, will tap up manually to final desired temperature of 1900C
Friday, September 30, 2016, 10:51
IGP1 = 7.8e-7 Torr
TGHT = 315A, 4.57V
TBHT = 174A, 2.8V
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Friday, September 30, 2016, 11:44
Changed OMEGA slope to 0.98
IGP1 = 1e-6 Torr
TGHT = 350A, 5.2V
TBHT = 201A, 3.4V
Increasing ramping rate of TBHT to 1.0A/min
OMEGA = 1625C / MIKRON = 1625C
Friday, September 30, 2016, 15:45
IGP1 = 1.1e-6 Torr
TGHT = 430A, 6.79V
TBHT = 230A, 4.07V
OMEGA = 1903C
Will remain at max setpoints over weekend.
See attached link for raw data of manual tap up.
Also see attached photos of screenshots showing oval - not circular - tube of target container at two different temperatures...
Monday, October 03, 2016, 13:28
IGP1 = 1.79e-7 Torr
TGHT = 430A, 6.87V
TBHT = 230A, 4.06V
OMEGA = 1892C
MIKRON = 1847C
Attached is a picture taken through the MIKRON, the slight oval shape appears to be a minor bend in the target container:
With the ionizer tube facing into the page, the bend appears to be in the center with both ends of the container bent slightly towards the page
This possible bend in the container gives the appearance of the oval shape through the camera while it is being heated, due to the angle of the camera
Remained at max setpoints over weekend.
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Tuesday, October 04, 2016, 13:40
Vented in air and opened up this morning.
Container done, TaC coating looks good.
Waiting further inspection...
Tuesday, October 04, 2016, 14:48
Container placed on jig and inspected.
Approved to go ahead for use online by Anders and Friedhelm.
|