Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Message ID: 270     Entry time: Monday, January 11, 2016, 15:47
Author: Laura Lambert 
Target Material: SiC 
Target Oven W.O#: 41077-3 
Source: LP-SIS 
Status: Done 
Subject: Conditioning SiC test target for test stand measurements 

Monday, January 11, 2016, 15:25

Small center block LP-SIS container previously sintered with TaC coating

3x Ta heat shields

Container is loaded with 260 discs of SiC with a total length of 8.5cm

Loaded into evap2 and pumped down this morning

HS water valves opened up, no leaks detected

Tapped up manually to 30A

Vacuum stable

IGP1 = 1e-6 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively

Final setpoints: 400A for the TGHT and 230A for the TBHT

Final desired temperature: 1700C


 Tuesday, January 12, 2016, 12:55

TGHT = 138A, TBHT = 80A

IGP1 =  7.7e-6 Torr.


Vacuum stable and coming down.

Increasing ramping rate to 0.5A/min and 0.2A/min for the TGHT and TBHT respectively.


 Wednesday, January 13, 2016, 09:32

TGHT reached 400A ~11.5hrs ago

TBHT reached 230A ~8hrs ago

OMEGA = 1400C

IGP1 = 1.75e-7 Torr

Tapping up manually to 1700C...


 Wednesday, January 13, 2016, 10:14

Previous temperature measurement of OMEGA = 1400C is wrong due to window port being coated with SiC [see attached photos]

Will remain at TGHT = 420A for 4hrs then cool down this afternoon


Wednesday, January 13, 2016, 14:29

Remained at max setpoints for 4.5hrs.

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Thursday, January 14, 2016, 09:47

Vented in air and opened up this morning

Target looks good

Will insert and expand endcaps this afternoon


 

Attachment 1: Photo_2016-0-13.jpg  1.074 MB  Uploaded Wednesday, January 13, 2016, 11:28  | Show | Show all
Attachment 2: Photo_2016-01-13_#2.jpg  889 kB  Uploaded Wednesday, January 13, 2016, 11:28  | Show | Show all
Attachment 3: Photo_2016-01-13_#3.jpg  1006 kB  Uploaded Wednesday, January 13, 2016, 11:28  | Show | Show all
Attachment 4: Photo_2016-01-13_#4.jpg  1.317 MB  Uploaded Wednesday, January 13, 2016, 11:29  | Show | Show all
ELOG V2.9.2-2455