Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2  Not logged in ELOG logo
Entry  Friday, August 01, 2014, 13:27, Peter Kunz , , 40282-3, LP-SIS, In progress, ZrC #6 conditioning zrc6_conditioning.png
    Reply  Tuesday, August 05, 2014, 12:01, Laura Lambert, , 40282-3, LP-SIS, Done, ZrC #6 conditioning 
Message ID: 148     Entry time: Friday, August 01, 2014, 13:27     Reply to this: 149
Author: Peter Kunz  
Target Material:  
Target Oven W.O#: 40282-3 
Source: LP-SIS 
Status: In progress 
Subject: ZrC #6 conditioning 

Target was conditioned for 4 hours at 580A.

Initiating ramp-down sequence @ 2A/min

 

Attachment 1: zrc6_conditioning.png  32 kB  | Hide | Hide all
zrc6_conditioning.png
ELOG V2.9.2-2455