Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 2 of 15  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  20   Wednesday, May 11, 2011, 16:23 John WongSiC38481-8HP-FEBIADProblems Organics burnoff & Sintering Wed May 11 16:20:21 2011:  The HP-FEBIAD
(w.o#38481-8) was filled with SiC (8.5mm,
555 discs).  The target is wrapped with
 9x 
  22   Wednesday, May 18, 2011, 13:13 John WongSiC38295-8HP-FEBIADProblemsOrganics burnoff & Sintering Wed May 18 13:12:24 2011:  Target
is wrapped with 3 Ta-heat shields and is
installed in the evaporator which is being
 6x 
  26   Wednesday, July 27, 2011, 13:02 John WongUC238634-3LP-SISProblemsUCx#2 conditioning Wednesday, July 27, 2011, 12:58: 
Target length = 11.2cm
Total UC2/C foils = 245 discs
 striptool_july31.pngTarget_with_3_heat_shields.jpgstriptool_july31_600A.jpgUCx#2-conditioning.jpg 
  50   Monday, June 11, 2012, 10:48 John WongUO2/CUCx-heatboat#2 ProblemsUC2 flakes - batch#01-04062012: broken seal & TGHT power supply

    

       
            
  
  53   Sunday, June 24, 2012, 22:52 John WongUO2/CUCx-heatboat#2 ProblemsUC2 flakes - batch#01-04062012: IOC problems

    

       
            
 IOC_problem.png 
  119   Saturday, August 29, 2015, 16:12 Anders Mjos   ProblemsRestarting vacuum after power outageSaturday, August 29, 2015, 16:10: Roughing
Saturday, August 29, 2015, 16:10:
Starting turbo
  
  149   Friday, May 26, 2017, 15:23 Laura LambertUO2/C40282-1TARGET BOATProblemsprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS

    

       
            
 6x 
  151   Monday, May 29, 2017, 08:54 Laura LambertUO2/C40282-1TARGET BOATProblemsprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS

    

       
            
 evap1_tripped_off_roud2_UCxFlk_16.jpgevap1_tripped_off_roud2_UCxFlk_16(2).jpg 
  156   Thursday, July 13, 2017, 12:49 Laura Lambert   Problems*hot lab is HOT*Thursday, July 13, 2017, 12:48
NOTE: hot lab reached 27degrees every
day this week and went up to 28C today! 
 Capture.JPG 
  157   Thursday, July 13, 2017, 14:50 Laura LambertUC242218-15LP-SISProblemsConditioning UCx#21

    

       
            
  
  160   Thursday, July 20, 2017, 15:00 Laura LambertUC242218-15LP-SISProblemsConditioning UCx#21

    

       
            
 Capture.JPGCapture3.JPG 
  181   Monday, January 22, 2018, 15:51 Marla CervantesUO2/C40282-2 TARGET BOATProblemsCarbonizing UO2/C discs for 1stepUCx in graphite sample container_#6

    

       
            
  
  185   Monday, January 29, 2018, 11:07 Marla CervantesUO2/C40282-2 TARGET BOATProblemsCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#7

    

       
            
  
  190   Thursday, February 08, 2018, 14:51 Marla CervantesUO2/C40282-2 TARGET BOATProblemsCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#10 Thursday, February 08, 2018, 14:50
35 circles from cast#2 of 14
  
  193   Tuesday, February 13, 2018, 11:44 Marla CervantesUO2/C40282-1TARGET BOATProblemsCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#11 Tuesday, February 13, 2018, 11:39
35 circles of 14 mm diameter
 Carbonization-current_trippoff2.JPGTa-Boat.jpgC-Container.jpg 
  200   Monday, April 09, 2018, 16:51 Laura LambertUO2/C40282-2TARGET BOATProblemsCarbonizing first full length 1step UCx target

    

       
            
 evap1_trip.JPGevap1_trip_archive.JPG 
  209   Wednesday, June 13, 2018, 11:09 Marla CervantesUO2/C40282-1TARGET BOATProblemsCarbonizing UO2/C discs for 1stepUCx in graphite sample container #14

    

       
            
  
  222   Monday, October 22, 2018, 17:58 Marla CervantesUO2/C27252-1TARGET BOATProblemsProcessing UC2Flk_22Monday, October 22, 2018, 17:55 
UO2/C green was prepared , September
 current-trip-1.jpgcurrent-trip-2.jpg 
  223   Tuesday, October 23, 2018, 10:24 Marla CervantesUC2 LP-SISProblemsConditioning UCx#25

    

       
            
  
  226   Wednesday, October 24, 2018, 20:01 Marla CervantesUO2/C27252-1TARGET BOATProblemsProcessing UC2Flk_22

    

       
            
 PowerSupply-TempLog.xlsxCT-2.jpg 
ELOG V2.9.2-2455