Wed Apr 6 17:06:56 2011: Target oven is wrapped with 3 Ta-heat shields. Pumping down evaporator in progress.
Thu Apr 7 09:32:36 2011: Evaporator has been pumped down for over 16 hrs, vac @ 1.74e-6 Torr (see attachment#1). Target heater is turned on and about to ramp up.
Thu Apr 7 09:37:11 2011: TGHT @ 20A/0.071V, panel reads 18A.
Thu Apr 7 09:38:16 2011: TGHT @ 40A/0.147V, panel reads 37A.
Thu Apr 7 09:40:53 2011: Auto-heating begins. (See attachment#2 for Parameter Setup)
Fri Apr 8 10:08:07 2011: Auto-cooling process began last night at 8:30pm. Instructions were given to the on shift ISAC-Ops to being the auto cooling. The process was finished this morning at around 3am. (See attachment#3 for the cooling down process). The evaporator p/s is off and ready to be vented.
|