Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1  Not logged in ELOG logo
Message ID: 61     Entry time: Monday, September 10, 2012, 11:00
Author: Peter Kunz  
Target Material: UC2 
Target Oven W.O#: 39165-5 
Source: LP-SIS 
Status: In progress 
Subject: Conditioning UCx05 
Plot of conditioning run: IEVAP:IG1, TGHT
Attachment 1: UC2_05_conditioning.png  9 kB  | Hide | Hide all
UC2_05_conditioning.png
ELOG V2.9.2-2455