Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1  Not logged in ELOG logo
Message ID: 44     Entry time: Monday, November 14, 2011, 11:56
Author: Peter Kunz  
Target Material: UC2 
Target Oven W.O#: 38634-10 
Source: LP-SIS 
Status: Done 
Subject: UCx03: Conditioning up to 175A 

Evaporator was cleaned Nov 11 from after target was conditioned up to 175A. There was significant condensation of oily fluid on the left side where the target container was open (D-shaped end cap). There were also deposits in the hole for the ionizer, but the ionizer itself seemed to be clean.

Attachment 1: 0--0009.jpg  377 kB  | Show | Hide all
Attachment 2: 0--0011.jpg  351 kB  | Hide | Hide all
0--0011.jpg
ELOG V2.9.2-2455