Thursday, November 03, 2011, 08:59
Target was previously coated/sintered with TaC & wrapped with 3 Ta-heat shields, including the back-block.
Target was loaded with 365 UC2 discs + 3 samples for analysis.
One regular endcap and one D-cap on the other end where the 3 samples sit.
Evaporator has been pumped down since last night. Currently vac @ 2.0e-6 Torr.
For this final conditioning, here are the instructions:
1. Slowly stepping up TGHT to 100A to burn off the organic binder. Vacuum is expected to rise to the limit and stay at the plateau for a few days.
2. Once the vacuum has come down, the target will be cooldown and the chamber will be vented with Ar. The cup-holder may be filled with the organic binder and needed to be clean.
3. Pump back down the evaporator; step up TGHT to 100A and wait for the reaction.
4. Initial TGHT auto ramping. Set TGHT to 520A @ rate of 0.1A/min.
5. Allow TGHT to held at 520A for 4 hours, then cool down.
6. Remove target from the chamber and store in the air-tight box and transferred to the Ar-glove box.
Thursday, November 03, 2011, 09:13
TGHT reached to 55A, and vacuum slowly to rise. Vac @ 5.7e-6 Torr.
Wil stay at 55A for now...
Thursday, November 03, 2011, 09:51
A spike in vacuum and triggered the alarm handler but didn't tripped the TGHT.
Brought TGHT back down to 50A.
Initiated Auto-heating. Set TGHT to 100A @ 0.1A/min.
Thursday, November 03, 2011, 18:25
I just found out that the target heater did not reach to 100A. The auto-heating was running to bring up TGHT to 100, but the readback stayed at 50A. Peter K. was contacted. We stopped the auto-heating program and instantly the target heating jumped to 100A. Quickly, we brought down the heater to 50A. (see attachment1 for the stiptool). Not sure what was happening.
I stepped up the TGHT manually to 61A, and the pressure is slowing increasing.
Thursday, November 03, 2011, 19:26
Something is wrong with the TGHT power supply. I stepped it up from 55 to 63A, and found the readback stuck at 58 (local @ 56). So, I tapped the TGHT down to 58A and then the readback followed the setpoint.
I tried again to bring it up to 63 and it stuck at 60A, and tapping down and up the slider triggered the readback to follow the setpoint. This is a fault in the system.
Peter was informed, and is taking over this for now. We need to bring up the THGT up to 100A to burn off the organic binder. I don't know what we should do from here. I need a break!
Friday, November 04, 2011, 15:46
As per Jane, there is a problem with the network issue that controls the target heater power supply. The power supply current is not regulating proper. (see attachment #2)
TGHT was ramped down from 85A to 0A for Control to work on the problem since this morning.
See e-fault#5672, WP#2011-11-04-5.
Monday, November 07, 2011, 11:12
Control has fixed the network issue.
Stepped up to 10A, local read 8A.
Initiated autoramping, setp TGHT to 20A at 1A/min. TGHT did reach to 20A with no problem.
Stepped up further to 30A, local at 28A.
I conclude that the power supply is now regulating properly.
Conditioning of UCx#3 continues...
Monday, November 07, 2011, 12:14
TGHT at 84.5A, locat @ 82A. Vacuum hovering at 7.2e-5 Torr.
Initiated auto-ramping: TGHT set to 100A, at 0.1A/min. Incrementing current if vac < 5.0e-5 Torr and backing off if vac >6.0e-5 Torr.
Monday, November 14, 2011, 11:03
TGHT reached to 175A on Nov 11, 2011 to finish off the organics burnout process.
Then TGHT was cool down @ 2A/min until TGHT reached to zero.
Evaporator was vented with Ar and the chamber was open.
The target was removed from the evaporator; the organic binder was condensed out from the D-endcap and some from the ionizer tube (See attachment 3 & 4).
One of the samples was retrieved for analysis, and the D-endcap was put back.
The target was installed back, and the chamber was pumped down.
The sintering and thermal reduction processes continued with TGHT ramped up to 520A. Heating rate @ 0.1/min.
Target has been heated at 520A for ~5hrs, vac @ 5.35e-6 Torr. (see attachment 5).
Wednesday, November 16, 2011, 13:42
Target looks good. It has been installed in the heatshield, and it's being stored in the Ar-golve box.
Evaporator is now off.
|