Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1  Not logged in ELOG logo
Message ID: 41     Entry time: Thursday, September 29, 2011, 10:58
Author: John Wong 
Target Material: UO2/C 
Target Oven W.O#: UCx-heatboat#2 
Source:  
Status: Done 
Subject: UCx#3: Batch#1 - UO2/C mixture of carbonization  

Thursday, September 29, 2011, 10:54

UO2/C mixture was made on Tuesday Sept 27, casted on a piece of glass and let dried in the fume hood for ~2days. 

Dried UO2/C mass = 61.72g

Target material is wrapped /w graphite sheet and put on a new heatboat coated/sintered /w TaC.

Heat boat is wrapped with 3-Ta heat shields. 

Evaporator chamber is currently being pumped down. 


Friday, September 30, 2011, 10:01

Evaporator has been pumped down over night, IG currently @ 2.92e-6 Torr, BP @ 27mT.

TGHT will be stepped up to 40A and allow the pressure to slowly increase.  


Friday, September 30, 2011, 10:30  

TGHT is holding at 40A/0.139V  (local @ 37A), and pressure is slowly increasing, expect pressure to stabilize at ~4.5e-5 Torr before being auto-heating.

See attachment#1: TGHT_40A. 


Friday, September 30, 2011, 13:39

TGHT has been at 40A for more than 3 hrs.  Pressure went as high as 6.9e-5 Torr and it's now coming down.  (See attachment#2:  TGHT@40A_3hrs)

Auto-heating is initiating.  TGHT rate @ 0.1A/min to reach to max current of 525A.  (see attachment#3: parameter.jpg) 


Sunday, October 09, 2011, 10:44  

Target heater reached to 520A and held for a few hours.  

Evaporator was cooled down last night and TGHT is now at 0A.

(For the overall process, see Attachment#4: UCx#3_batch1.jpg) 

IG1 @ 5.7e-7 Torr.  Chamber will be vented with Ar on Tuesday. 

TGHT is off and water valve is shut.  


 Tuesday, October 11, 2011, 13:10

Evaporator glovebox was purged with Ar prior to venting the chamber with Ar.  

Layers of burnout marks were coated all around the inside of the evaporator (see attachment#5. Evpr_afterprocess.jpg), 

Before cleaning, the evaporator chamber had ~200,000 cpm. 

The heating boat containing UCx was removed from the evaporator and stored in the "orange" case, then transferred to the Ar-glove box.

Weight of UCx flasks:  47.15g (See attachment#6: UCx#3_batch1_mass.jpg)

The evaporator was thoroughly cleaned; the burnout marks were removed, and it will be used for UCx#3:batch#2 - UO2/C process.


 

 

Attachment 1: TGHT_40A.jpg  84 kB  Uploaded Friday, September 30, 2011, 11:33  | Hide | Hide all
TGHT_40A.jpg
Attachment 2: TGHT@40A_3hrs.jpg  84 kB  Uploaded Friday, September 30, 2011, 14:59  | Show | Hide all
Attachment 3: parameter.jpg  40 kB  Uploaded Friday, September 30, 2011, 14:59  | Show | Hide all
Attachment 4: UCx#3_batch1.jpg  26 kB  Uploaded Sunday, October 09, 2011, 12:09  | Show | Hide all
Attachment 5: Evpr_afterprocess.jpg  1.069 MB  Uploaded Tuesday, October 11, 2011, 14:13  | Show | Hide all
Attachment 6: UCx#3_batch1_mass.jpg  669 kB  Uploaded Tuesday, October 11, 2011, 14:16  | Show | Hide all
ELOG V2.9.2-2455