Tuesday, September 13, 2011, 16:51
Target is wrapped with 3-Ta heat shields.
Loaded with 555 SiC discs (total mass 64.24g)
18cm in length.
D-end cap on one end, and a regular end end on the other.
Chamber is currently being pump down
Wednesday, September 14, 2011, 09:58
Evaporator has been pumped down over night, currently IG @ 1.71e-6 Torr. BP @ 23mT.
The target will be heated up to 550A and will wait to see any reaction happen before increasing TGHT (Max 820A).
TGHT stepped up to 90A, local @ 87A. Pressure slowly rising, IG @ 2.7e-6 Torr. BP @ 23mT.
Start auto-heating @ 0.5A/min to max TGHT @ 500A.
Friday, September 16, 2011, 00:27:
TGHT @ 250A and pressure has already started to come down, currently at 2.8e-5 Torr.
Increased TGHT rate from 0.5A/min to 2A/min, and pressure started to rise. Stopped auto-ramping after pressure increased to 4.4e-5 Torr. (see attachment#1: TGHT_270A-300A.jpg).
Decreased TGHT rate back to 0.5A/min and changed pressure limit to 3.0e-5 Torr.
Friday, September 16, 2011, 01:49 :
TGHT @ 347A, and pressure seems to come down slowly.
Change TGHT auto heating to 550A and pressure limit at 2.5e-5 Torr. Vac currently at 2.4e-5 Torr. Ramping rate at 0.5A/min.
Friday, September 16, 2011, 10:58
TGHT reached 580A and no spike in the vacuum. Ramping up TGHT to 590A, keeping pressure limit @ 1.35e-5 Torr,
Currently IG @ 1.33 e-5 Torr. Current TGHT @ 585.5A, local @ 579A.
(see attachment 3: TGHT_580A)
Friday, September 16, 2011, 11:35:
TGHT reached to 590A, not much of out-gassing. Pressure increased from 1.30e-5 Torr to 1.40e-5 Torr.
Continue ramping up TGHT, set to 700A, pressure limiting @ 1.5e-5 Torr.
Friday, September 16, 2011, 15:29:
TGHT reached to 700A, local @ 692A; pressure was stable at 1.38e-5 Torr throughout the whole time.
Continues ramping up TGHT to 820A (max) at 0.5A/min; pressure limiting @ 1.5e-5 Torr.
Friday, September 16, 2011, 22:05
TGHT reached to 820A (local 810A) and held for ~3hrs. IG @ 5.4e-6Torr and coming down, BP @ 20mT.
See attachment#4: TGHT_820A.
TGHT cooling down begins...
Monday, September 19, 2011, 10:08
TGHT was cooled down over the weekend.
See attachment#4: archiver_TGHT_0-820A.
Currently, IG @ 6.9e-7 Torr, BP @ 27mT.
Evaporator will be vented.
Tuesday, September 20, 2011, 08:51
Target turned out well.
D-cap was removed and replaced with a regular TaC-coated sintered endcap with a graphite foil.
See attachments for details.
Target is now ready for assembly and test for test-stand.
|