Message ID: 28     Entry time: Thursday, August 04, 2011, 17:46
Author: John Wong 
Target Material: UC2 
Target Oven W.O#: 38634-8 
Source: LP-SIS 
Status: Problems resolved 
Subject: Repacking UCx in new target oven 

Thursday, August 04, 2011, 17:44:  All the UCx material from target oven 38634-3 was recovered and repacked in this new oven.  Total mass recovered = 45.911g and packed in 10.7cm length.  Target is currently being pumped down. 

Thursday, August 04, 2011, 20:23:  Current vac 5.6e-6 Torr.  Stepping up TGHT to 104A, vac increasing slowly.  Being auto heating @ 2A/min to 200A. 

Thursday, August 04, 2011, 21:32 THGT @ 200A,( see attachment1: 200A.jpg)

Friday, August 05, 2011, 09:04:  TGHT reached to 520A, and was cool down last night by ISAC Ops.  (See attachment2: re-conditioning).  Target looks good! 

Attachment 1: 200A.jpg  66 kB  Uploaded Thursday, August 04, 2011, 22:32  | Show | Hide all
Attachment 2: reconditioning.jpg  66 kB  Uploaded Friday, August 05, 2011, 10:05  | Hide | Hide all
reconditioning.jpg
ELOG V2.9.2-2455