Thursday, August 04, 2011, 17:44: All the UCx material from target oven 38634-3 was recovered and repacked in this new oven. Total mass recovered = 45.911g and packed in 10.7cm length. Target is currently being pumped down.
Thursday, August 04, 2011, 20:23: Current vac 5.6e-6 Torr. Stepping up TGHT to 104A, vac increasing slowly. Being auto heating @ 2A/min to 200A.
Thursday, August 04, 2011, 21:32 THGT @ 200A,( see attachment1: 200A.jpg)
Friday, August 05, 2011, 09:04: TGHT reached to 520A, and was cool down last night by ISAC Ops. (See attachment2: re-conditioning). Target looks good! |