Entry  Thursday, November 22, 2018, 17:32, Marla Cervantes, UO2/C, 40202-1, TARGET BOAT, Problems, UCx Fully loaded graphite insert - UCx26 Nov23-CurrenTrip1.jpgNov23-CurrenTrip2.jpg
    Reply  Monday, November 26, 2018, 17:06, Marla Cervantes, UO2/C, 40202-1, TARGET BOAT, Done, UCx Fully loaded graphite insert - UCx26 CR-UCx26.png
Message ID: 231     Entry time: Thursday, November 22, 2018, 17:32     Reply to this: 232
Author: Marla Cervantes 
Target Material: UO2/C 
Target Oven W.O#: 40202-1 
Source: TARGET BOAT 
Status: Problems 
Subject: UCx Fully loaded graphite insert - UCx26 

 Thursday, November 22, 2018, 17:25

D-shaped discs were cut from cast #26

A 13mm punch was used to punch out discs from pre-cut strips

The target consists of 236 discs of 10 cm in length - all single discs, no packs.

236 x UO2/C discs = 22.66 g

Graphite insert with caps = 11.74 g

The loaded inser is placed on target boat.

Boat previously coated with TaC and sintered.

Ta-target boat is wrapped with 3-layers (2 new one used) of heat shield and installed in evap1.

Chamber is pumping down.


 Friday, November 23, 2018, 08:53

Vacuum limits:

Good vacuum 1e-1 Torr

Bad vacuum 5e-1 Torr

IGP1 = 4.12 e-6 Torr

Current tapped manually to 100 A at 1A/s in 10 A blocks with a waiting period of 20 s between each increment.

Initial IGP1 = 5.31 e-6 Torr

Max  IGP1 = 0.066 Torr

Waited 20 min for pressure to rise and drop.

The current tripped off, when the 0.013 torr  (Fig. Nov23-CurrentTrip1).

Increasing the current to 100 A again.


IGP1 = 7.00e-5 Torr

Rate was increased to 25 A each 20 s until 200 A

The pressure increased and IV1 opened, current was dropped to 100 A

Pressure after 5 min 4e-4 Torr

Rate was increased again to 25 A each 20 s until 200 A

The current was reduced to 110 A because the pressure was rising to fast

Rate was increased again to 25 A each 20 s until 300 A

Pressure was ok and current tripped off  (Fig. Nov23-CurrentTrip2).

The automatic ramp was set to 20 A/ min from 0 to 300 A

The automatic ramp was changed to 10A/2min to 450 A

IGP1 = 2.15e-5 Torr

After 1.5 hour, the automatic ramp was set to 20 A/ min from 450 to 500 A

After 4hrs, the automatic ramp was set to -2 A/ min from 500 to 0 A

Attachment 1: Nov23-CurrenTrip1.jpg  105 kB  Uploaded Tuesday, December 18, 2018, 16:04  | Show | Hide all
Attachment 2: Nov23-CurrenTrip2.jpg  110 kB  Uploaded Tuesday, December 18, 2018, 16:04  | Hide | Hide all
Nov23-CurrenTrip2.jpg