Mon Apr 18 18:10:53 2011:
FEBIAD-HP target (w.o 38295-8) is coated with TaC (previously prepared on Feb 15, 2011). This target will be used for the SiC run in Oct, 2011. The target is wrapped with 3 Ta-heat shields and is in the evaporator. Pumping down of the evaporator is in process, currently vac @ 3.66e-5 Torr.
Tue Apr 19 11:00:36 2011: Evaporator has been pumped down over night (~17hrs). Vac is currently at 1.84e-6 Torr (See Attachment#1: pumping down curve).
Tue Apr 19 11:09:49 2011: TGHT @ 30A/0.086V, Vac @ 1.82e-6 Torr.
Tue Apr 19 11:13:05 2011: TGHT @ 60A/0.184V, Vac @ 1.75e-6 Torr.
Tue Apr 19 11:14:06 2011: Auto-heating will begin @ 0.5A/min until vacuum is stable then the auto ramping rate will increase. (See Attachment#2: parameter setup).
Tue Apr 19 14:27:08 2011: TGHT is currently at 148A/0.65V, vac @ 1.92e-5 Torr. The pressure spiked up to 7.7e-5 Torr (trip @ 8e-5 Torr) at ~124A. The current was lowered down to 120A to allow the pressure to come down (See Attachment#3: Vac_curve). Auto-heating rate has changed to 1A/min.
Wed Apr 20 10:08:52 2011: TGHT reached to 700A and stayed for about 5 hours. ISAC Ops helped to start the auto cooling down process. (See Attachment#3: Overall Process).
Tue Apr 26 11:12:36 2011
Result: The dried coating isn't looking the same like the rest of the target. Typically, the finished coating looks gray. But a layer (or line) of light brown coating can been seen from one end of the target to the other end.
--> This target was heated up to 700A. Will try to re-heat this again to 820A.
Re-heating the Target
Tue Apr 26 12:44:30 2011: Target is wrapped with 3 Ta-heat shield and is in the evaporator which is currently being pumped down.
Tue Apr 26 17:39:40 2011: TGHT was tapped up to 70A before began with auto-heating @ 2A/min to 820A max. Currently TGHT at 204A/1.0V, Vac @ 3.97e-6 Torr. ISAC Ops will help to start auto cooling at 04:00 on April 27.
Wed Apr 27 12:26:41 2011: Auto cooling completed. P/S off and evaporator is vented, (See Attachment#5: Overall Process_2). Target oven looks good; finished surface looks gray, as expected.
|