Message ID: 154     Entry time: Monday, June 12, 2017, 15:07
Author: Laura Lambert 
Target Material: UO2/C 
Target Oven W.O#: 40282-1 
Source: TARGET BOAT 
Status: Done 
Subject: Processing UC2Flk_17 

 Monday, June 12, 2017, 11:41

UO2/C green was prepared June 7th, 2017.

The cast peeled off the glass nicely June 8th, 2017.

Initial UO2 powder used = 50.10g (Inventory R-01032A, UO2 + bottle = 776.36g before use)

Graphite powder used = 10.06g

Green cast dried UO2/C + organic mass = 62.98g 

The green was rolled up and wrapped in a piece of graphite sheet.

The Ta-target boat was wrapped with 1 long layer of heat shield [reused from last carbonization] and installed in evap1 this morning.

Chamber pumped down.

Target boat will be ramped up to 520A.

Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.

IG1 = 1.58e-5 Torr

Tapped up to 30A, 0.21V

Waited ~1hr45, vacuum stable.

IG1 = 8.59e-6 Torr

Initiating auto-ramp at 0.1A/min


 Tuesday, June 13, 2017, 10:32

IG1 = 5.0e-5 Torr

TGHT = 65A, 0.47V

Vacuum currently yo-yo-ing, but stable.

Changing vacuum limits.

Vacuum limit stop at 2.0e-4 Torr, backing off at 5.0e-4 Torr.

Increasing ramping rate to 0.2A/min.


Thursday, June 15, 2017, 16:24  

IG1 = 1.96e-4 Torr

TGHT = 520A, 5.18V

TGHT has reached 520A, the vacuum remains at it's limit.

Vacuum usually drops and stabilizes slightly before the max setpoint is reached indicating carbonization process complete.

Since vacuum remains high, this indicates the carbonization remains incomplete.

Conditions have changed such as vacuum limits, which has greatly sped up the process.

This increase in speed could have an impact on the current at which the carbonization occurs.

Increasing max setpoint to 530A and re-initiating auto-ramp.


 Friday, June 16, 2017, 08:32

Vacuum stable, started decreasing when TGHT reached 530A - carbonization process complete.

Evap1 has remained at max setpoints for ~11hrs, but has remained at low vacuum for ~5hrs.

IG1 = 5.56e-6 Torr

TGHT = 530A, 5.31V

Initiating auto-cool at 1.0A/min

TP = 24.9C, RT = 24.3C

*note TP now has water cooling as well as fan pointed at it for this entire process


 Monday, June 19, 2017, 16:16

Vented in Ar and transferred from evap1 to glove box this a.m

UC2 flakes produced = 48.66g


 

Attachment 1: UC2Flk_17_entire_carbonization_process_using_new_vacuum_limits.JPG  62 kB  Uploaded Wednesday, September 27, 2017, 14:44  | Show | Hide all
Attachment 2: UC2Flk_17_vac_vs._cur.JPG  82 kB  Uploaded Wednesday, September 27, 2017, 14:50  | Show | Hide all
Attachment 3: UC2Flk_17_vac_vs._volt.JPG  80 kB  Uploaded Wednesday, September 27, 2017, 14:50  | Hide | Hide all
UC2Flk_17_vac_vs._volt.JPG
ELOG V2.9.2-2455