Monday, July 11, 2016, 15:54
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block - new wrapping method-see elog112 evap2
The target consists of 216 discs of UCx with 7.6cm in length [4 packs of 5 + 196 single discs].
A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.
The right side is open with a TaC coated spring to help hold materials in.
The chamber is currently pumping down.
TGHT will be ramped up to 410A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog308 evap2]
Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.
Tuesday, July 12, 2016, 08:50
IG1 = 5.3e-6 Torr
Tapped up manually to 35A
Vacuum stable.
IG1 = 5.25e-6 Torr.
Initiating auto-ramp.
Friday, July 15, 2016, 16:59
With evap2 not working, water was turned off to check valves...this tripped off evap1 since this also turned off the water to evap1.
TGHT was ~115A when evap1 tripped off.
Vacuum stable = 2.9e-6 Torr.
Tapped back up manually to 115A, 1.08V
Vacuum stable = 2.8e-6 Torr.
Restarting auto ramp at 0.1A/min.
Friday, July 22, 2016, 16:25
Target has remained at max setpoints for 4.5days.
TGHT = 410A, 3.99V
IG1 = 2.5e-6 Torr
Voltage has wavered a small amount, between 3,91V-4.02V; this can be seen in the photo attached of the screenshot of the striptool.
Conditioning process is now complete.
Initiating auto-cool at 1.0A/min
Tuesday, July 26, 2016, 16:48
Vented in Ar and currently transfering into glove box
will update elog tomorrow...
Wednesday, July 27, 2016, 14:56
had a few problems with the transfer chamber in the glove box, but managed to get the target into the glove box okay last night.
was exposed to oxygen for minimal amount of time - transfer chamber wasnt flushing properly/ leak in james bond box
|