Tuesday, April 05, 2016, 10:58
UO2/C green was prepared March 31, 2016.
The cast peeled off the glass nicely April 1, 2016 and finished drying over the weekend. [see attached picture]
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.47g (Inventory R-00835A, UO2 + bottle = 168.33g before use)
Graphite powder used = 10.05g
Green cast dried UO2/C + organic mass = 59.50g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield and installed in evap1 yesterday.
Chamber has been pumped down overnight, currently at IG1 = 3.7e-6 Torr.
Manually stepping up to 35A...
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Tuesday, April 05, 2016, 15:04
Waited ~4hrs, vacuum stable.
IG1 = 8.5e-6 Torr.
Initiating auto-ramp.
Friday, April 15, 2016, 13:50
IG1 = 3.2e-6 Torr
TGHT = 520A, 5.15V
TGHT remained at max setpoints for ~10hrs
Carbonization process is complete.
Initiating auto-cool at 2.0A/min.
Monday, April 18, 2016, 11:08
vented in argon and removed from evap1.
stored in glove box.
will measure flakes produced tomorrow...
Tuesday, April 19, 2016, 15:32
UC2 flakes produced = 45.99g
|