Message ID: 107     Entry time: Monday, January 26, 2015, 11:28
Author: Laura Lambert 
Target Material: UO2/C 
Target Oven W.O#: 40282-1 
Source: TARGET BOAT 
Status: Done 
Subject: Processing UC2Flk_05 

 Monday, January 26, 2015, 11:19

UO2/C green was prepared Jan 20, 2015. The slurry was cast on a piece of glass coated with WD40 on Jan 21, 2015.

The cast was let dry over the weekend and peeled off the glass nicely Jan 26, 2014. [see attached picture]

Some materials were stuck on the WC jar wall and balls, consistent with every time.

Initial UO2 powder used = 50.32g (Inventory R-00835A, UO2 + bottle = 494.52g before use)

Graphite powder used = 10.02g

Green cast dried UO2/C + organic mass = 60.33g

The green was rolled up and wrapped in a piece of graphite sheet.

The Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.

Chamber is currently being pumped down.

Target boat will be ramped up to 520A at the rate of 0.1A/min

Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.


 Wednesday, January 28, 2015, 11:33

change of plan.

there will be several interruptions over the course of the next month including a planned power outage and water shut off.

therefore UO2/C cannot be carbonized as these interruptions  will trip off the system when UO2/C would be at max temperature.

EVAP1 is now turned off and the flakes will be stored in the fume hood until further notice.


 Thursday, April 09, 2015, 16:03

EVAP1 has been cleaned.

Target boat has been reloaded into evap1 and currently pumping down.

Will initiate ramp up tomorrow.


 Friday, April 10, 2015, 08:05

IGP1 = 1.7e-6 Torr

Tapped up manually to 35A.

Waited ~2hrs, vacuum stable.

IGP1 = 9.7e-6 Torr.

Initiating auto-ramp.


 Monday, April 20, 2015, 11:20

TGHT reahed 520A, 5.78V on the weekend.

The boat has been sitting at max setpoint for 4.5hours.

Carbonization process is complete [See attachment].

IGP1 = 3.4e-6 Torr.

Initiating auto-cool at 2A/min.


 Tuesday, April 21, 2015, 16:20

Vented in Ar and opened up today.

Now in glove box.


 Monday, May 11, 2015, 11:58

UC2 flakes produced = 46.477g