Monday, January 26, 2015, 11:19
UO2/C green was prepared Jan 20, 2015. The slurry was cast on a piece of glass coated with WD40 on Jan 21, 2015.
The cast was let dry over the weekend and peeled off the glass nicely Jan 26, 2014. [see attached picture]
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.32g (Inventory R-00835A, UO2 + bottle = 494.52g before use)
Graphite powder used = 10.02g
Green cast dried UO2/C + organic mass = 60.33g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber is currently being pumped down.
Target boat will be ramped up to 520A at the rate of 0.1A/min
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Wednesday, January 28, 2015, 11:33
change of plan.
there will be several interruptions over the course of the next month including a planned power outage and water shut off.
therefore UO2/C cannot be carbonized as these interruptions will trip off the system when UO2/C would be at max temperature.
EVAP1 is now turned off and the flakes will be stored in the fume hood until further notice.
Thursday, April 09, 2015, 16:03
EVAP1 has been cleaned.
Target boat has been reloaded into evap1 and currently pumping down.
Will initiate ramp up tomorrow.
Friday, April 10, 2015, 08:05
IGP1 = 1.7e-6 Torr
Tapped up manually to 35A.
Waited ~2hrs, vacuum stable.
IGP1 = 9.7e-6 Torr.
Initiating auto-ramp.
Monday, April 20, 2015, 11:20
TGHT reahed 520A, 5.78V on the weekend.
The boat has been sitting at max setpoint for 4.5hours.
Carbonization process is complete [See attachment].
IGP1 = 3.4e-6 Torr.
Initiating auto-cool at 2A/min.
Tuesday, April 21, 2015, 16:20
Vented in Ar and opened up today.
Now in glove box.
Monday, May 11, 2015, 11:58
UC2 flakes produced = 46.477g |