  473   Mon Dec 17 14:08:52 2012 Keerthi Jayamanna  IRIS beam delivary is completedIRIS beam delivery is completed with extra
3 days of beam providing to them.
18O2 and 40Ar+2 were delivered with
  
  472   Fri Dec 14 17:30:47 2012 Keerthi Jayamanna  18OH2 and 40Ar+2 delivaryDuring the last week we delivered 18O+2
from microwave ion source to Ritu.
Over the week end changed to 40Ar+2.
  
  471   Sun Dec 2 23:36:13 2012 Keerthi JayamannaRoutineGeneral16O+2 is ready for tuning.MCIS finished xenon development. MCIS is off
and isolation valve is shut.
A new oxygen gas line is installed to microwave
  
  470   Sun Dec 2 22:34:09 2012 Keerthi Jayamanna  Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam    
  469   Sun Dec 2 22:32:19 2012 Keerthi JayamannaRoutineGeneralStill cannot write anything other than Subject    
  468   Wed May 23 17:11:57 2012 Keerthi Jayamanna  Changed beam to 12C++ beamRemoved titanium from the back plate and
clean the source.
But left the PE titanium insert since
  
  467   Thu Nov 10 09:57:57 2011 Damien Gallop  OLIS ShutdownSupernanogan on overnight with 36Ar+7 on
FC6. Nice.
Today is the last day of scheduled
 Picture_3.png 
  466   Wed Nov 9 11:40:35 2011 Damien Gallop  OLIS ShutdownSupernanogan 36Ar+7 source development
in progress. RF frequency scans are the agenda
for today.
 Picture_8.pngPicture_9.png 
  465   Tue Nov 8 10:02:54 2011 Damien Gallop  OLIS ShutdownSupernanogan is online with 36Ar+7 on FC6
overnight. Looks good. Note: The source gas
arrangement (enriched 36Ar) utilizes double
 Picture_3.pngPicture_4.pngPicture_5.pngPicture_7.pngPicture_6.png 
  464   Mon Nov 7 09:58:17 2011 Damien Gallop  OLIS ShutdownIOS pumped well over the weekend. Present
pressure is 1.5e-7. MCIS pumps off
for setup.
 Picture_2.pngPicture_1.png 
  463   Fri Nov 4 09:41:32 2011 Damien Gallop  OLIS ShutdownMCIS continues to pump well. IOS DB assembly
planned for today.
Later... DB assembly complete and
 Picture_22.png 
  462   Thu Nov 3 09:50:05 2011 Damien Gallop  OLIS ShutdownMCIS pumped well overnight. Source development
imminent.
Later... possible IOS intervention.
 Picture_21.png 
  461   Wed Nov 2 10:16:49 2011 Damien Gallop  OLIS ShutdownMCIS pumpdown continues well. IOS optics
coming along. DB3 installed last night and
IOS is under vacuum very early. DB1/2 optics
 Picture_21.png 
  460   Tue Nov 1 10:18:02 2011 Damien Gallop  OLIS ShutdownMCIS pumped overnight. Still coming down.  Picture_20.png 
  459   Mon Oct 31 11:06:58 2011 Damien Gallop  OLIS ShutdownTwo weeks of OLIS Shutdown have begun.
The plan is to complete refurbishing this
week and pump next week, with 36Ar+6 beam
 grab.g18922.png 
  458   Mon Oct 31 11:04:06 2011 Damien Gallop  33S+6 from MCIS to DRAGON EOBDeliver concluded yesterday morning around
09:00.
Pity to have to switch off the source. OLIS
 Picture_17.png 
  457   Fri Oct 28 10:18:53 2011 Damien Gallop  33S+6 from MCIS to DRAGONDelivery continued overnight.  Picture_16.png 
  456   Wed Oct 26 10:17:53 2011 Damien Gallop  33S+6 from MCIS to DRAGONDelivery continued
uneventfully overnight and is continuing.
Later... source is just getting better
 Picture_13.pngPicture_14.png 
  455   Tue Oct 25 09:41:32 2011 Damien Gallop  33S+6 from MCIS to DRAGONBeam petered out earlier this morning after
an attempt to tweak the RF frequency. Restored.
Plasma was on throughout. ICR has lowered
 Picture_12.png 
  454   Mon Oct 24 10:10:34 2011 Damien Gallop  33S+6 from MCIS to DRAGONDelivery since Friday
Beam on but intensity
is dropping, suggesting that enriched 33S
 Picture_10.png 