473
Mon Dec 17 14:08:52 2012
Keerthi Jayamanna
IRIS beam delivary is completed
IRIS beam delivery is completed with extra
3 days of beam providing to them.
18O2 and 40Ar+2 were delivered with
472
Fri Dec 14 17:30:47 2012
Keerthi Jayamanna
18OH2 and 40Ar+2 delivary
During the last week we delivered 18O+2
from microwave ion source to Ritu.
Over the week end changed to 40Ar+2.
471
Sun Dec 2 23:36:13 2012
Keerthi Jayamanna
Routine
General
16O+2 is ready for tuning.
MCIS finished xenon development. MCIS is off
and isolation valve is shut.
A new oxygen gas line is installed to microwave
470
Sun Dec 2 22:34:09 2012
Keerthi Jayamanna
Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam
469
Sun Dec 2 22:32:19 2012
Keerthi Jayamanna
Routine
General
Still cannot write anything other than Subject
468
Wed May 23 17:11:57 2012
Keerthi Jayamanna
Changed beam to 12C++ beam
Removed titanium from the back plate and
clean the source.
But left the PE titanium insert since
467
Thu Nov 10 09:57:57 2011
Damien Gallop
OLIS Shutdown
Supernanogan on overnight with 36Ar+7 on
FC6. Nice.
Today is the last day of scheduled
466
Wed Nov 9 11:40:35 2011
Damien Gallop
OLIS Shutdown
Supernanogan 36Ar+7 source development
in progress. RF frequency scans are the agenda
for today.
465
Tue Nov 8 10:02:54 2011
Damien Gallop
OLIS Shutdown
Supernanogan is online with 36Ar+7 on FC6
overnight. Looks good. Note: The source gas
arrangement (enriched 36Ar) utilizes double
464
Mon Nov 7 09:58:17 2011
Damien Gallop
OLIS Shutdown
IOS pumped well over the weekend. Present
pressure is 1.5e-7. MCIS pumps off
for setup.
463
Fri Nov 4 09:41:32 2011
Damien Gallop
OLIS Shutdown
MCIS continues to pump well. IOS DB assembly
planned for today.
Later... DB assembly complete and
462
Thu Nov 3 09:50:05 2011
Damien Gallop
OLIS Shutdown
MCIS pumped well overnight. Source development
imminent.
Later... possible IOS intervention.
461
Wed Nov 2 10:16:49 2011
Damien Gallop
OLIS Shutdown
MCIS pumpdown continues well. IOS optics
coming along. DB3 installed last night and
IOS is under vacuum very early. DB1/2 optics
460
Tue Nov 1 10:18:02 2011
Damien Gallop
OLIS Shutdown
MCIS pumped overnight. Still coming down.
459
Mon Oct 31 11:06:58 2011
Damien Gallop
OLIS Shutdown
Two weeks of OLIS Shutdown have begun.
The plan is to complete refurbishing this
week and pump next week, with 36Ar+6 beam
458
Mon Oct 31 11:04:06 2011
Damien Gallop
33S+6 from MCIS to DRAGON EOB
Deliver concluded yesterday morning around
09:00.
Pity to have to switch off the source. OLIS
457
Fri Oct 28 10:18:53 2011
Damien Gallop
33S+6 from MCIS to DRAGON
Delivery continued overnight.
456
Wed Oct 26 10:17:53 2011
Damien Gallop
33S+6 from MCIS to DRAGON
Delivery continued
uneventfully overnight and is continuing.
Later... source is just getting better
455
Tue Oct 25 09:41:32 2011
Damien Gallop
33S+6 from MCIS to DRAGON
Beam petered out earlier this morning after
an attempt to tweak the RF frequency. Restored.
Plasma was on throughout. ICR has lowered
454
Mon Oct 24 10:10:34 2011
Damien Gallop
33S+6 from MCIS to DRAGON
Delivery since Friday
Beam on but intensity
is dropping, suggesting that enriched 33S