OLIS Logbook General
  General, Page 3 of 26  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Type Category Subject
  473   Mon Dec 17 14:08:52 2012 Keerthi Jayamanna  IRIS beam delivary is completed

IRIS beam delivery is completed with extra 3 days of beam providing to them.

18O2 and 40Ar+2 were delivered with few attenuators i place.

  472   Fri Dec 14 17:30:47 2012 Keerthi Jayamanna  18OH2 and 40Ar+2 delivary

During the last week we delivered 18O+2 from microwave ion source to Ritu.

Over the week end changed to 40Ar+2.

Ritu informed us 18OH2 is coming with 40Ar+2.

Moving the slits ops managed to reduce 18H2 contaminant from the beam.

Good lesson for the future. Bad combination one after the other.

  471   Sun Dec 2 23:36:13 2012 Keerthi JayamannaRoutineGeneral16O+2 is ready for tuning.
MCIS finished xenon development. MCIS is off and isolation valve is shut.
A new oxygen gas line is installed to microwave ion source via a hand valve neat PE.
Hand valve is tuned as a small leak so that the plasma can run with all other gas valves are shut.
However if one need to start the source Ne gas valves are needed to be opened.
A 3.13nA of 16O+2 is sitting at FC6 and ready to use as pilot beam.
  470   Sun Dec 2 22:34:09 2012 Keerthi Jayamanna  Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam
  469   Sun Dec 2 22:32:19 2012 Keerthi JayamannaRoutineGeneralStill cannot write anything other than Subject
  468   Wed May 23 17:11:57 2012 Keerthi Jayamanna  Changed beam to 12C++ beam

Removed titanium from the back plate and clean the source.

But left the PE titanium insert since Bob and Marco badly want the 12C++ beam from the source fast.

Background 12C++ was only 400pA so installed a small canister with CO in it with bellow atm. pressure.

Now source is running with ~2nA current.

  467   Thu Nov 10 09:57:57 2011 Damien Gallop  OLIS Shutdown

Supernanogan on overnight with 36Ar+7 on FC6. Nice.

Today is the last day of scheduled OLIS Shutdown. Expect more source development today followed by a hand-off to ICR at some point.

Attachment 1: Picture_3.png
Picture_3.png
  466   Wed Nov 9 11:40:35 2011 Damien Gallop  OLIS Shutdown

Supernanogan 36Ar+7 source development in progress. RF frequency scans are the agenda for today.

Later... Some good beam results and 300enA beam on FC6. Note: 5mm slits are in.

Attachment 1: Picture_8.png
Picture_8.png
Attachment 2: Picture_9.png
Picture_9.png
  465   Tue Nov 8 10:02:54 2011 Damien Gallop  OLIS Shutdown

Supernanogan is online with 36Ar+7 on FC6 overnight. Looks good. Note: The source gas arrangement (enriched 36Ar) utilizes double buffer canisters and calibrated leaks, and requires MCIS:TP3 off.

Controls is preparing to perform an IOSIOS reboot for the sake of new code for ILT:RPM8 or something like that.

Attachment 1: Picture_3.png
Picture_3.png
Attachment 2: Picture_4.png
Picture_4.png
Attachment 3: Picture_5.png
Picture_5.png
Attachment 4: Picture_7.png
Picture_7.png
Attachment 5: Picture_6.png
Picture_6.png
  464   Mon Nov 7 09:58:17 2011 Damien Gallop  OLIS Shutdown

IOS pumped well over the weekend. Present pressure is 1.5e-7. MCIS pumps off for setup.

Later... Supernanogan is online with better than 250enA of 36Ar7+ on FC6 presently ~17:00. Note: MCIS:TP3 is off by intention for this run.

Attachment 1: Picture_2.png
Picture_2.png
Attachment 2: Picture_1.png
Picture_1.png
  463   Fri Nov 4 09:41:32 2011 Damien Gallop  OLIS Shutdown

MCIS continues to pump well. IOS DB assembly planned for today.

Later... DB assembly complete and IOS under vacuum. Present pressure: 1e-6 Torr at ~18:00. All optics hold voltage.

Attachment 1: Picture_22.png
Picture_22.png
  462   Thu Nov 3 09:50:05 2011 Damien Gallop  OLIS Shutdown

MCIS pumped well overnight. Source development imminent.

Later... possible IOS intervention. Spin down turbos in anticipation... Meanwhile, MCIS pressure was at 7.8e-8 Tott at the start, and dropped to 7.4e-8 Torr immediately upon closure of MCIS:IV1. Note that IOS:IV0 remains open with interlocks bypassed.

Attachment 1: Picture_21.png
Picture_21.png
  461   Wed Nov 2 10:16:49 2011 Damien Gallop  OLIS Shutdown

MCIS pumpdown continues well. IOS optics coming along. DB3 installed last night and IOS is under vacuum very early. DB1/2 optics will remain out until the end of the next-up MCIS run.

Attachment 1: Picture_21.png
Picture_21.png
  460   Tue Nov 1 10:18:02 2011 Damien Gallop  OLIS Shutdown

MCIS pumped overnight. Still coming down.

Attachment 1: Picture_20.png
Picture_20.png
  459   Mon Oct 31 11:06:58 2011 Damien Gallop  OLIS Shutdown

Two weeks of OLIS Shutdown have begun. The plan is to complete refurbishing this week and pump next week, with 36Ar+6 beam ready at the end of it. IOS is vented and open. The Supernanogan cart is out, vented and open. Plasma chamber cleaning and refurbishing in situ are in progress. The IOS upstream optics DB1-3 have been removed for refurbishing on the bench.

Later... Supernanogan MRO completed and closed. Pumping underway by ~15:30. Leakup curve appended below.

Attachment 1: grab.g18922.png
grab.g18922.png
  458   Mon Oct 31 11:04:06 2011 Damien Gallop  33S+6 from MCIS to DRAGON EOB

Deliver concluded yesterday morning around 09:00. Pity to have to switch off the source. OLIS is now in its Shutdown.

Attachment 1: Picture_17.png
Picture_17.png
  457   Fri Oct 28 10:18:53 2011 Damien Gallop  33S+6 from MCIS to DRAGON

Delivery continued overnight.

Attachment 1: Picture_16.png
Picture_16.png
  456   Wed Oct 26 10:17:53 2011 Damien Gallop  33S+6 from MCIS to DRAGON

Delivery continued uneventfully overnight and is continuing.

Later... source is just getting better and better. See Stripchart below.

Attachment 1: Picture_13.png
Picture_13.png
Attachment 2: Picture_14.png
Picture_14.png
  455   Tue Oct 25 09:41:32 2011 Damien Gallop  33S+6 from MCIS to DRAGON

Beam petered out earlier this morning after an attempt to tweak the RF frequency. Restored. Plasma was on throughout. ICR has lowered RF amplitude to match beam intensity to yesterday's running conditions.

Attachment 1: Picture_12.png
Picture_12.png
  454   Mon Oct 24 10:10:34 2011 Damien Gallop  33S+6 from MCIS to DRAGON

Delivery since Friday Beam on but intensity is dropping, suggesting that enriched 33S powder is running out. Plan in place to add more this evening.

Attachment 1: Picture_10.png
Picture_10.png
ELOG V2.9.2-2455