  471   Sun Dec 2 23:36:13 2012 Keerthi JayamannaRoutineGeneral16O+2 is ready for tuning.MCIS finished xenon development. MCIS is off
and isolation valve is shut.
A new oxygen gas line is installed to microwave
  
  472   Fri Dec 14 17:30:47 2012 Keerthi Jayamanna  18OH2 and 40Ar+2 delivaryDuring the last week we delivered 18O+2
from microwave ion source to Ritu.
Over the week end changed to 40Ar+2.
  
  473   Mon Dec 17 14:08:52 2012 Keerthi Jayamanna  IRIS beam delivary is completedIRIS beam delivery is completed with extra
3 days of beam providing to them.
18O2 and 40Ar+2 were delivered with
  
  474   Mon Dec 17 14:10:22 2012 Keerthi Jayamanna  Gas flow controller faultControls group may need some assistance
from OLIS group in order to trouble shoot
the problem.
  
  493   Thu Oct 30 22:09:02 2014 Keerthi Jayamanna  Suoernanogan steeringIOS mass scan does not work.
A/Q        
   FC6     
  
  494   Thu Oct 30 22:44:45 2014 Keerthi JayamannaRoutineGeneralMass scan 3 to 4IOS mass scan if faulty. These is a manual
scan from mass 3 to 4
Const22 = 0.04187  adjusted
  
  495   Thu Oct 30 23:37:58 2014 Keerthi JayamannaRoutineGeneralMass scan 4 to 6A/Q           
FC6
4               
  
  496   Thu Oct 30 23:44:57 2014 Keerthi JayamannaRoutineGeneralOLIS Supernanogan mass scan 6 to 7.5A/q          
FC6  (only current over 100pA)
6.0          
  
  498   Sat Nov 1 13:31:17 2014 Keerthi Jayamanna  MCIS readyness for 76SeSupernanogan is running with oven no heat,
without 76selenium. MCIS:IG1=3e-7Torr.
Tune saved as 141101_1318_76Se+11tune.snap
  
  506   Tue Nov 25 12:23:28 2014 Keerthi JayamannaRoutineGeneral76Se+13 tune saved141125_1159_OLIS_76Se+13.snap is saved
in reference directory.
El=3480/4303V
  
  511   Mon Sep 14 11:21:16 2015 Keerthi JayamannaRoutineGeneral20Ne+2 beam saved20Ne+2 beam optics saved as 150914_1117_ios0iosfc6.snap   
  512   Wed Feb 22 21:46:27 2017 Keerthi Jayamanna  Elog is working nowElog is now functioning. We can start entering
notes
  
  513   Wed Feb 22 21:51:40 2017 Keerthi Jayamanna  SIS first beam is N1+1Chris confirmed the first SIS beam would
be Na+1. Next Rb+1 and then Li+1
  
  133   Fri Sep 11 23:42:45 2009 KeerthiOtherGeneralMCIS turbo pumpMCIS TP1 is not running well. Needs investigation
as soon as S1219 is completed.
Later... TP1 failed completely, and
 mcis_multi-state.png 
  138   Tue Sep 15 19:46:21 2009 KeerthiRoutineGeneralSupernanogan emittance scans090915_1915ILTEMIT.txt = 17O +3,  4.4uA
new tune, scanner offset +10V,  scanner
scale 100nA , 100x50 matrix
 9x 
  139   Tue Sep 15 20:02:46 2009 Keerthi  17O8+ on FC6 from MCIS0.4nA of 17O+8 is sitting on FC6. Development
will continue tomorrow.
 grab.I24583.png 
  140   Wed Sep 16 12:12:04 2009 KeerthiRoutineGeneral17O+3 emittance sacns090916_1156ILTEMIT.txt     
17O+3  good settings 50x100 ,  
333nA Scale, ~4uA
  
  141   Wed Sep 16 12:20:10 2009 Keerthi  17O+3 emittance with increased EL090916_1215ILTEMIT.txt   
EL increased, ~4.5uA, emittance increases,
50x100   17O+3
  
  142   Wed Sep 16 12:26:51 2009 KeerthiRoutineGeneral17O+3 emittance with changed steering090916_1222ILTEMIT.txt  Changed the
MCIS steering to center the beam in the EL.
17O+3 ~5uA, 50x100
  
  143   Wed Sep 16 12:48:13 2009 Keerthi  17O+5 double peaks090916_1242ILTEMIT.txt  17O+5 has
two peaks.
090916_1355ILTEMIT.txt  Repeat