OLIS Logbook General
  General, Page 3 of 26  Not logged in ELOG logo
Entry  Mon Dec 17 14:08:52 2012, Keerthi Jayamanna, , , IRIS beam delivary is completed 
IRIS beam delivery is completed with extra 3 days of beam providing to them.
18O2 and 40Ar+2 were delivered with few attenuators i place.
Entry  Fri Dec 14 17:30:47 2012, Keerthi Jayamanna, , , 18OH2 and 40Ar+2 delivary 
During the last week we delivered 18O+2 from microwave ion source to Ritu.
Over the week end changed to 40Ar+2.
Ritu informed us 18OH2 is coming with 40Ar+2.
Entry  Sun Dec 2 23:36:13 2012, Keerthi Jayamanna, Routine, General, 16O+2 is ready for tuning. 
MCIS finished xenon development. MCIS is off and isolation valve is shut.
A new oxygen gas line is installed to microwave ion source via a hand valve neat PE.
Hand valve is tuned as a small leak so that the plasma can run with all other gas valves are shut.
Entry  Sun Dec 2 22:34:09 2012, Keerthi Jayamanna, , , Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam 
 
Entry  Sun Dec 2 22:32:19 2012, Keerthi Jayamanna, Routine, General, Still cannot write anything other than Subject 
 
Entry  Wed May 23 17:11:57 2012, Keerthi Jayamanna, , , Changed beam to 12C++ beam 
Removed titanium from the back plate and clean the source.
But left the PE titanium insert since Bob and Marco badly want the 12C++ beam from the source fast.
Background 12C++ was only 400pA so installed a small canister with CO in it with bellow atm. pressure.
Entry  Thu Nov 10 09:57:57 2011, Damien Gallop, , , OLIS Shutdown Picture_3.png
Supernanogan on overnight with 36Ar+7 on FC6. Nice.
Today is the last day of scheduled OLIS Shutdown. Expect more source development today followed by a hand-off to ICR at some point.
Entry  Wed Nov 9 11:40:35 2011, Damien Gallop, , , OLIS Shutdown Picture_8.pngPicture_9.png
Supernanogan 36Ar+7 source development in progress. RF frequency scans are the agenda for today.
Later... Some good beam results and 300enA beam on FC6. Note: 5mm slits are in.
Entry  Tue Nov 8 10:02:54 2011, Damien Gallop, , , OLIS Shutdown Picture_3.pngPicture_4.pngPicture_5.pngPicture_7.pngPicture_6.png
Supernanogan is online with 36Ar+7 on FC6 overnight. Looks good. Note: The source gas arrangement (enriched 36Ar) utilizes double buffer canisters and
calibrated leaks, and requires MCIS:TP3 off.
Controls is preparing to perform an IOSIOS reboot for the sake of new code for ILT:RPM8 or something like that.
Entry  Mon Nov 7 09:58:17 2011, Damien Gallop, , , OLIS Shutdown Picture_2.pngPicture_1.png
IOS pumped well over the weekend. Present pressure is 1.5e-7. MCIS pumps off
for setup.
Later... Supernanogan is online with better than 250enA of 36Ar7+ on FC6 presently ~17:00. Note: MCIS:TP3 is off by intention for this run.
Entry  Fri Nov 4 09:41:32 2011, Damien Gallop, , , OLIS Shutdown Picture_22.png
MCIS continues to pump well. IOS DB assembly planned for today.
Later... DB assembly complete and IOS under vacuum. Present pressure: 1e-6 Torr at ~18:00. All optics hold voltage.
Entry  Thu Nov 3 09:50:05 2011, Damien Gallop, , , OLIS Shutdown Picture_21.png
MCIS pumped well overnight. Source development imminent.
Later... possible IOS intervention. Spin down turbos in anticipation... Meanwhile, MCIS pressure was at 7.8e-8 Tott at the start, and dropped to
7.4e-8 Torr immediately upon closure of MCIS:IV1. Note that IOS:IV0 remains open with interlocks bypassed.
Entry  Wed Nov 2 10:16:49 2011, Damien Gallop, , , OLIS Shutdown Picture_21.png
MCIS pumpdown continues well. IOS optics coming along. DB3 installed last night and IOS is under vacuum very early. DB1/2 optics will remain out until
the end of the next-up MCIS run.
Entry  Tue Nov 1 10:18:02 2011, Damien Gallop, , , OLIS Shutdown Picture_20.png
MCIS pumped overnight. Still coming down.
Entry  Mon Oct 31 11:06:58 2011, Damien Gallop, , , OLIS Shutdown grab.g18922.png
Two weeks of OLIS Shutdown have begun. The plan is to complete refurbishing this week and pump next week, with 36Ar+6 beam ready at the end of it. IOS
is vented and open. The Supernanogan cart is out, vented and open. Plasma chamber cleaning and refurbishing in situ are in progress. The IOS upstream optics
DB1-3 have been removed for refurbishing on the bench.
Entry  Mon Oct 31 11:04:06 2011, Damien Gallop, , , 33S+6 from MCIS to DRAGON EOB Picture_17.png
Deliver concluded yesterday morning around 09:00.
Pity to have to switch off the source. OLIS is now in its Shutdown.
Entry  Fri Oct 28 10:18:53 2011, Damien Gallop, , , 33S+6 from MCIS to DRAGON Picture_16.png
Delivery continued overnight.
Entry  Wed Oct 26 10:17:53 2011, Damien Gallop, , , 33S+6 from MCIS to DRAGON Picture_13.pngPicture_14.png
Delivery continued uneventfully overnight
and is continuing.
Later... source is just getting better and better. See Stripchart below.
Entry  Tue Oct 25 09:41:32 2011, Damien Gallop, , , 33S+6 from MCIS to DRAGON Picture_12.png
Beam petered out earlier this morning after an attempt to tweak the RF frequency. Restored. Plasma was on throughout. ICR has lowered RF amplitude to
match beam intensity to yesterday's running conditions.
Entry  Mon Oct 24 10:10:34 2011, Damien Gallop, , , 33S+6 from MCIS to DRAGON Picture_10.png
Delivery since Friday Beam on but intensity
is dropping, suggesting that enriched 33S powder is running out. Plan in place to add more this evening.
ELOG V2.9.2-2455