473
|
Mon Dec 17 14:08:52 2012 |
Keerthi Jayamanna | | | IRIS beam delivary is completed | IRIS beam delivery is completed with extra
3 days of beam providing to them.
18O2 and 40Ar+2 were delivered with |
|
472
|
Fri Dec 14 17:30:47 2012 |
Keerthi Jayamanna | | | 18OH2 and 40Ar+2 delivary | During the last week we delivered 18O+2
from microwave ion source to Ritu.
Over the week end changed to 40Ar+2. |
|
471
|
Sun Dec 2 23:36:13 2012 |
Keerthi Jayamanna | Routine | General | 16O+2 is ready for tuning. | MCIS finished xenon development. MCIS is off
and isolation valve is shut.
A new oxygen gas line is installed to microwave |
|
470
|
Sun Dec 2 22:34:09 2012 |
Keerthi Jayamanna | | | Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam | |
|
469
|
Sun Dec 2 22:32:19 2012 |
Keerthi Jayamanna | Routine | General | Still cannot write anything other than Subject | |
|
468
|
Wed May 23 17:11:57 2012 |
Keerthi Jayamanna | | | Changed beam to 12C++ beam | Removed titanium from the back plate and
clean the source.
But left the PE titanium insert since |
|
467
|
Thu Nov 10 09:57:57 2011 |
Damien Gallop | | | OLIS Shutdown | Supernanogan on overnight with 36Ar+7 on
FC6. Nice.
Today is the last day of scheduled |
|
466
|
Wed Nov 9 11:40:35 2011 |
Damien Gallop | | | OLIS Shutdown | Supernanogan 36Ar+7 source development
in progress. RF frequency scans are the agenda
for today. |
 |
465
|
Tue Nov 8 10:02:54 2011 |
Damien Gallop | | | OLIS Shutdown | Supernanogan is online with 36Ar+7 on FC6
overnight. Looks good. Note: The source gas
arrangement (enriched 36Ar) utilizes double |
    |
464
|
Mon Nov 7 09:58:17 2011 |
Damien Gallop | | | OLIS Shutdown | IOS pumped well over the weekend. Present
pressure is 1.5e-7. MCIS pumps off
for setup. |
 |
463
|
Fri Nov 4 09:41:32 2011 |
Damien Gallop | | | OLIS Shutdown | MCIS continues to pump well. IOS DB assembly
planned for today.
Later... DB assembly complete and |
|
462
|
Thu Nov 3 09:50:05 2011 |
Damien Gallop | | | OLIS Shutdown | MCIS pumped well overnight. Source development
imminent.
Later... possible IOS intervention. |
|
461
|
Wed Nov 2 10:16:49 2011 |
Damien Gallop | | | OLIS Shutdown | MCIS pumpdown continues well. IOS optics
coming along. DB3 installed last night and
IOS is under vacuum very early. DB1/2 optics |
|
460
|
Tue Nov 1 10:18:02 2011 |
Damien Gallop | | | OLIS Shutdown | MCIS pumped overnight. Still coming down. |
|
459
|
Mon Oct 31 11:06:58 2011 |
Damien Gallop | | | OLIS Shutdown | Two weeks of OLIS Shutdown have begun.
The plan is to complete refurbishing this
week and pump next week, with 36Ar+6 beam |
|
458
|
Mon Oct 31 11:04:06 2011 |
Damien Gallop | | | 33S+6 from MCIS to DRAGON EOB | Deliver concluded yesterday morning around
09:00.
Pity to have to switch off the source. OLIS |
|
457
|
Fri Oct 28 10:18:53 2011 |
Damien Gallop | | | 33S+6 from MCIS to DRAGON | Delivery continued overnight. |
|
456
|
Wed Oct 26 10:17:53 2011 |
Damien Gallop | | | 33S+6 from MCIS to DRAGON | Delivery continued
uneventfully overnight and is continuing.
Later... source is just getting better |
 |
455
|
Tue Oct 25 09:41:32 2011 |
Damien Gallop | | | 33S+6 from MCIS to DRAGON | Beam petered out earlier this morning after
an attempt to tweak the RF frequency. Restored.
Plasma was on throughout. ICR has lowered |
|
454
|
Mon Oct 24 10:10:34 2011 |
Damien Gallop | | | 33S+6 from MCIS to DRAGON | Delivery since Friday
Beam on but intensity
is dropping, suggesting that enriched 33S |
|