392
|
Fri Mar 25 17:42:38 2011 |
Keerthi Jayamanna | | | OLIS HV start up |
High Voltage cage is on at ~17:43pm
Interlock cleard and HV (10kV) is on at 17:53pm |
415
|
Wed Jul 20 01:37:46 2011 |
Keerthi Jayamanna | | | Al beam development: |
Supernanogan is tested for Al+6 beam production.
A 8nA of mass 4.5 is seen. Background pressure is not good enough to
produce more Al+6. Attempt to increase Al beam current with higher sputtering
voltages resulted in fast destruction of the Al sample.
Decided to move to the microwave ion source.
Clean all the Mg and installed Al liners and the Al PE electrode.
Source is now pumping down. Damien, Please start the source as soon as you arive. Try to keep PE current below 500mA. Optimum is ~200mA |
417
|
Wed Aug 3 00:15:39 2011 |
Keerthi Jayamanna | Other | General | 22Ne+2 |
Source started at 800W of microwave power and 2cc/min neon gas easily. New magnetron produces more power than the old one.
We should try to keep MW power under 500W during running and use only 800W for ignition. EE left off for the night. |
468
|
Wed May 23 17:11:57 2012 |
Keerthi Jayamanna | | | Changed beam to 12C++ beam |
Removed titanium from the back plate and clean the source.
But left the PE titanium insert since Bob and Marco badly want the 12C++ beam from the source fast.
Background 12C++ was only 400pA so installed a small canister with CO in it with bellow atm. pressure.
Now source is running with ~2nA current. |
469
|
Sun Dec 2 22:32:19 2012 |
Keerthi Jayamanna | Routine | General | Still cannot write anything other than Subject |
|
470
|
Sun Dec 2 22:34:09 2012 |
Keerthi Jayamanna | | | Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam |
|
471
|
Sun Dec 2 23:36:13 2012 |
Keerthi Jayamanna | Routine | General | 16O+2 is ready for tuning. |
MCIS finished xenon development. MCIS is off and isolation valve is shut.
A new oxygen gas line is installed to microwave ion source via a hand valve neat PE.
Hand valve is tuned as a small leak so that the plasma can run with all other gas valves are shut.
However if one need to start the source Ne gas valves are needed to be opened.
A 3.13nA of 16O+2 is sitting at FC6 and ready to use as pilot beam. |
472
|
Fri Dec 14 17:30:47 2012 |
Keerthi Jayamanna | | | 18OH2 and 40Ar+2 delivary |
During the last week we delivered 18O+2 from microwave ion source to Ritu.
Over the week end changed to 40Ar+2.
Ritu informed us 18OH2 is coming with 40Ar+2.
Moving the slits ops managed to reduce 18H2 contaminant from the beam.
Good lesson for the future. Bad combination one after the other. |
473
|
Mon Dec 17 14:08:52 2012 |
Keerthi Jayamanna | | | IRIS beam delivary is completed |
IRIS beam delivery is completed with extra 3 days of beam providing to them.
18O2 and 40Ar+2 were delivered with few attenuators i place. |
474
|
Mon Dec 17 14:10:22 2012 |
Keerthi Jayamanna | | | Gas flow controller fault |
Controls group may need some assistance from OLIS group in order to trouble shoot the problem. |
493
|
Thu Oct 30 22:09:02 2014 |
Keerthi Jayamanna | | | Suoernanogan steering |
IOS mass scan does not work.
A/Q FC6 X Y CCB1
1 2.07e-7 167 97 500
2 2.18e-7 308 247
2.14 1e-11 388 277
2.246 2.07e-8 358 227
2.30 2e-9 378 227
2.366 1.28e-8 388 277
2.392 2.1e-11 388 277
2.4641 1.98e-11 388 277
2.5345 6.49e-11 398 277
2.5614 1.81e-10 398 227
2.6263 2.95e-7 398 227
2.7522 2.07e-8 398 227
2.7896 2.06e-10 398 227
2.8652 3.22e-11 398 227
2.9515 8.52e-8 398 237
|
494
|
Thu Oct 30 22:44:45 2014 |
Keerthi Jayamanna | Routine | General | Mass scan 3 to 4 |
IOS mass scan if faulty. These is a manual scan from mass 3 to 4
Const22 = 0.04187 adjusted to mass = 4
A/q FC6 X Y
3.0075 8.14e-8 398 237
3.1222 4.93e-10 398 237
3.2064 6.24e-7 398 237
3.2613 1.05e-9 408 237
3.3395 2.29e-10 408 237
3.4072 5.6e-10 408 237
3.5089 3.36e-8 408 237
3.5600 1.4e-10 408 237
3.6069 1.86-9 408 237
3.6436 8.46e-10 408 237
3.7514 4.02e-10 418 237
3.8387 4.37e-9 418 237
3.8883 3.43e-10 418 237
3.9416 1e-10 418 237
4 1.1e-6 418 237 500 |
495
|
Thu Oct 30 23:37:58 2014 |
Keerthi Jayamanna | Routine | General | Mass scan 4 to 6 |
A/Q FC6
4 1.1e-6
4.25 8e-10
4.34 1.2e-9
4.42 5.5e-9
4.51 2.59e-9
4.58 1.7e-10
4.66 1.7e-10
4.74 1.7e-10
4.85 4.6e-10
5.0 1.36e-10
5.07 1.5e-10
5.13 2.69e-10
5.25 4.89e-10
5.33 9e-7
5.39 3.0e-10
5.56 3.3e-10
5.67 1.12e-9
5.7 5e-9
5.83 4e-10
5.92 2e-10
6.000 1.85e-7
|
496
|
Thu Oct 30 23:44:57 2014 |
Keerthi Jayamanna | Routine | General | OLIS Supernanogan mass scan 6 to 7.5 |
A/q FC6 (only current over 100pA)
6.0 1.85e-7
6.15 4.96e-10
6.23 2.4e-10
6.31 6.14e-10
6.39 2e-10
6.51 1.82e-9
6.90 2.7e-10
7.00 5e-8
7.1 4.6e-9
7.27 1e-10
7.5 3.32e-10
|
498
|
Sat Nov 1 13:31:17 2014 |
Keerthi Jayamanna | | | MCIS readyness for 76Se |
Supernanogan is running with oven no heat, without 76selenium. MCIS:IG1=3e-7Torr.
Tune saved as 141101_1318_76Se+11tune.snap
MCIS steering X=330, Y=226, CCB1=500, MCISEL=4171/5157, PE=11.5/23, FC6=76nA(16O+7) |
506
|
Tue Nov 25 12:23:28 2014 |
Keerthi Jayamanna | Routine | General | 76Se+13 tune saved |
141125_1159_OLIS_76Se+13.snap is saved in reference directory.
El=3480/4303V
MCIS:YCB1=110
MCIS:XCB1=190
MCIS:CCB1=300
Frequency = 14.44765GHz
Amplitude = -10.880
TET FP= 9.8W
TWT RP = 1.8W
|
511
|
Mon Sep 14 11:21:16 2015 |
Keerthi Jayamanna | Routine | General | 20Ne+2 beam saved |
20Ne+2 beam optics saved as 150914_1117_ios0iosfc6.snap |
512
|
Wed Feb 22 21:46:27 2017 |
Keerthi Jayamanna | | | Elog is working now |
Elog is now functioning. We can start entering notes |
513
|
Wed Feb 22 21:51:40 2017 |
Keerthi Jayamanna | | | SIS first beam is N1+1 |
Chris confirmed the first SIS beam would be Na+1. Next Rb+1 and then Li+1 |
484
|
Fri Oct 10 14:02:56 2014 |
Raymond Dube | Routine | General | Test with new Alga, ALPA 50W RF AMP |
We did a test yesterday with the new Alga Microwave RF AMP, model # ALPA 50 Watt, serial # 130684 to be used for the MCIS. We used the RF Generator from MISTIC and set the frequency to 13.80 Ghz, note that the RF Generator was/is limited to 16DB maxiumum RF output.
The RF cable that we used was from the 200W RF AMP, it has a 20DB SMA attenuator at the Generator end, so we could only get about 25 Watts maximum output. |
Attachment 1: ALPA-RF_AMP-50W.pdf
|